My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 3:31:37 PM
Creation date
11/12/2019 3:25:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 15,2005 <br /> 1804BK.5 <br /> Mr. Harlin Knoll,San Joaquin County <br /> Page 2 <br /> details. The annulus of each well above the sand pack will be backfilled to the ground surface using <br /> neat cement with approximately 5 percent bentonite powder in accordance with the requirements of <br /> the San Joaquin County Environmental Health Department well installation permit. The wells will <br /> be completed at the surface with traffic-rated watertight well boxes set flush with the existing <br /> surface. The wells will installed in accordance with California Water Well Standards as outlined in <br /> Bulletins 74-81 and 74-90 and with San Joaquin County requirements (if different from state <br /> requirements). <br /> Enclosed please find a completed permit application,permit fees, a certificate of insurance from <br /> driller, a copy of the drillers C-57 license, and a site map showing the well locations. Check No. <br /> 5472 for$89.00 is enclosed for processing the new well installation permit application. We trust <br /> that the information provided in this letter is sufficient for processing the new permit application. <br /> Your continued assistance with this project is greatly appreciated. If you have any questions or <br /> comments regarding this letter,please contact the undersigned at(916) 782-8700. <br /> Respectfully, '�pNAL CEO <br /> E2C Remediatio <br /> d <br /> \ Exp. f <br /> Gary . Haeck, Ph.D. P.G. No.6046 <br /> Principal Geologist F0F CAL�F�� <br /> RATechnicalTrojects\1804BK Busy Bee\permitting\Buddhist priv-property permit application.doc <br /> ATTACHMENTS: <br /> Figure 1 —Site Location Map <br /> Figure 1 —Well at 23 N. Stockton Street <br /> Completed Well Permit Application <br /> Access Agreement <br /> Check for$89.00 for well permit fees <br /> A Certificate of Insurance from Driller <br /> Copy of the Well Completion Detail <br />
The URL can be used to link to this page
Your browser does not support the video tag.