My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 3:31:37 PM
Creation date
11/12/2019 3:25:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• September 5.2001 <br /> 1.0 INTRODUCTION <br /> This Remedial Investigation Feasibility Study (RIFS) Workplan (Workplan) has been prepared to <br /> perform initial site investigation at the former Busy Bee Cleaners (Site), 40 N. Main Street, Lodi, <br /> California. Based the results of this initial investigation, additional investigation and/or <br /> remediation may be required at the Site. As proposed, this RIFS will occur in several phases of <br /> work as follows: <br /> • Phase 1 — Initial investigation to assess if a problem, such as soil and/or groundwater <br /> contamination exists; <br /> • Phase 2 — If a problem is found in Phase I, Phase II consists of defining the extent of the <br /> problem, or contamination, in two directions, vertically and areally; in addition, the <br /> magnitude of the contamination concentration-wise, both vertically and areally, is also <br /> defined; <br /> • Phase 3 — Once Phase II is complete and the full extent and chemical magnitude of the <br /> contamination has been defined, then remedial alternatives can be identified and <br /> evaluated based on the type, extent and chemical magnitude of the contamination. <br /> Remedial alternatives that are deemed feasible are then selected and evaluated using a <br /> suitability/cost matrix. The eventual selection of the recommended remedial technology <br /> will be the final product of this work. <br /> 1.1 Phase 1 Purpose <br /> The investigation described in this workplan has the following objectives: <br /> • Assess existing soil conditions at the Site and property adjacent to the Site (with owner's <br /> written permission); <br /> • Assess groundwater conditions beneath the Site; <br /> • Recommend appropriate further action for the Phase II portion of the RIFS, if warranted. <br /> 1.2 Scope of Work <br /> • The scope of services described in this Workplan include: <br /> • Locate underground utilities using Client's as-built drawings (if available) as well as <br /> Underground Service Alert (U.S.A.); <br /> • Obtain necessary permits and/or regulatory approvals; <br /> • Advance five (5) drilled soil borings and one (1) hand-auger boring at the locations <br /> shown on Figure 1; Note: the drilled borings will be advanced to groundwater whereas <br /> the hand-auger boring will be advanced to approximately 20 feet bgs; <br /> • Collect soil samples at 5-foot intervals beginning at five feet below ground surface (bgs) <br /> and continuing until total depth. The samples will be collected using brass or stainless <br /> steel sleeves; <br /> • Field screen samples for volatile organic compounds (VOCs) using a hydrogen flame- <br /> ionizing detector (FID); <br /> • Secure soil samples in sleeves sealed with Teflon, end caps and tape. The sealed <br /> tubes will be placed in a cooler at 40 centigrade and transported to a DHS certified <br /> laboratory under Chain-of-Custody procedures. Selected samples will be chosen for <br /> chemical analysis; <br /> E2C Remediation, LLC 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.