My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1976
>
2900 - Site Mitigation Program
>
PR0515044
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 1:54:29 PM
Creation date
11/13/2019 1:51:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515044
PE
2950
FACILITY_ID
FA0012027
FACILITY_NAME
NUNES HAY SERVICE INC
STREET_NUMBER
1976
Direction
N
STREET_NAME
UNION
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21602068
CURRENT_STATUS
01
SITE_LOCATION
1976 N UNION ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f' <br /> 6 . Remediation Steps : Nunes Brothers have retained Jim Thorpe Oil <br /> Co . , Inc . .to undertake this resampling project . After consultation <br /> with Harlan Knoll of San Joaquin County Public Health Services/ <br /> ;Environmental Health Division and Jim Thorpe Oil Co. , Inc . , Nunes <br /> 'Brothers have decided' to excavate in the former tank locations and <br /> 'retrieve two soil samples from each end of the excavation_ <br /> 7 . Soil Sampling: Soil sampling will be accomplished by retrieving <br /> samples from the appropriate areas with the backhoe bucket . Sam- <br /> ples will .be taken from the bucket by a GeoAnalytical Laboratories <br /> representative on-site. All sampling and analyses will follow <br /> LUFT guidelines and will be taken at the direction of San Joaquin <br /> County Public Health Services/ Environmental Health Division rep- <br /> resentative Harlan Knoll . Samples will be transported by the <br /> GeoAnalytical representative directly to their Laboratories', lo- <br /> cated in Modesto, CA under chain of custody. Samples will be <br /> ;tested for TPH-G by test method 801.5, BTE&X by test method <br /> 'Oxygenates by test method 8260 B and Total Lead. . <br /> 8 . :Backfill : Backfilling will be done by Jim Thorpe Oil personnel . <br /> 9 . .Work Schedule: Work is scheduled .for 6/4/99 9 A.M. <br /> Sample analyses results ;should be ready for review within 2 weeks . <br /> 10. .Health and Safety Plan: Attached. <br /> Respectfully submitted, <br />{ <br /> JIM THORPE OIL, INC. <br /> Richard Thorpe <br /> President <br /> ,Attachments : <br /> t <br /> 9 <br /> 2 <br /> li <br /> IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.