Laserfiche WebLink
DEVELOPMENT COMMITTEE MEMORANDUM <br /> QS-91-6 <br /> PAGE THREE <br /> n. A performance guarantee, payable to San Joaquin County <br /> and the State Geologist, shall be required to ensure <br /> rehabilitation of ehe site n ostmpliance with of rehabilitation lshall <br /> ons <br /> of approval. The estimated <br /> be reviewed by the Department of Public Works. No <br /> financial guarantee will be required for areas not <br /> excavated. When an inspection shows thtt r habilitanion <br /> is in conformance with the approved permit, <br /> Administrator will terminate the financial guarantee. On <br /> abandonment of excavation for eighteen (18) months or <br /> more, bankruptcy of the operator or any occurrence which, <br /> in the opinion of the review authority, jeopardizes the <br /> rehabilitation of the excavation, the County may use all <br /> or any portion of the fund to rehabilitate the si under this <br /> The <br /> type of guarantee proposed by the app <br /> licant Section must be found acceptable by County Counsel. The <br /> type of financial guarantee may be, but is not limited <br /> to: <br /> a. A faithful performance bond, <br /> b. A property escrow or escrow account, <br /> C. A trust fund. (Section 9-2244 (u) ) <br /> cavation <br /> o. Dikes shall be constructed around ter shall be dareas under i e t d by <br /> outside of the expansion pit. ponds. Construction <br /> pipe or ditch to and from settling P the ns artment <br /> of dikes shall be subject to approval by P <br /> of Public Works and the State Water Quality <br /> Control Boand <br /> and shall be designed to prevent erosion, <br /> water runoff from the site. <br /> SSS/KA <br />