Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> QX-91-6 <br /> 3. Encroachment permit shall be required for work within road <br /> right-of-way . <br /> 4 . A video tape of road conditions on Waverly Road from Shelton <br /> Road to Flood Road is required prior to start of excavation <br /> The condition of Waverly Road shall be reviewed with the <br /> Department of Public Works prior to start of excavation <br /> and every five ( 5 ) years thereafter . If it is determined <br /> necessary by the Public Works Department during the <br /> excavation, the applicant shall construct an acceleration <br /> lane and/or a left turn lane on Waverly Road to permit safe <br /> egress and ingress from the site . Road construction and <br /> design shall be subject to approval by the Department of <br /> Public Works. The applicant shall pay for the fees for <br /> plan-check, inspection and the construction cost. <br /> S. A bond or cash deposit in the amount acceptable to the <br /> Department of Public Works shall be filed with the <br /> Department with a guarantee that, if the Permittee fails, <br /> refuses, or neglects to repair, under permit, any damages <br /> to Waverly road, which may result from Permittee ' s <br /> operations, the Department of Public Works may do the work <br /> necessary to restore Waverly Road equal to, or better than, <br /> its original condition, using the funds from said bond or <br /> cash deposit. <br /> A bond or cash deposit in the amount acceptable to the <br /> Department of Public Works shall be filed with the <br /> Department with a guarantee that, if the permittee fails, <br /> refuses, or neglects to reclaim on project site, the Public <br /> Works Department may do the work of reclamation using the <br /> funds from said bond or cash deposit. The progress of <br /> reclamation shall be reviewed with the Department of Public <br /> Works every five (5 ) years and the end of excavation . <br />