Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> QX-91-6 <br /> 7 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $200.51 <br /> per daily trip-end in the Linden area. The fee shall be <br /> automatically adjusted annually by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record . ) <br /> c : Manuel Lopez, Deputy director/Development <br />