Laserfiche WebLink
when not in motion. <br /> 1.4 . 6 Traffic and Transportation <br /> The possibility that the proposed project expansion would have an <br /> adverse impact upon traffic and transportation was investigated in <br /> detail. <br /> E1 Rancho Rock and Sand, Inc. Quarry wishes to permit for an <br /> anticipated maximum over the life of the quarry of 100 haul trucks <br /> per day, and an average of 80 haul trucks per day. <br /> Analysis indicates that roadways serving the quarry are in good to <br /> excellent condition, suitable for significant truck traffic or an <br /> elevated traffic index. The proposed increase in traffic due to <br /> expanded quarry operations will not have a significant impact upon <br /> the service level of the affected roads. <br /> No significant impacts or adverse environmental changes will result <br /> from the increase in haul truck traffic. <br /> 1.4 .7 Cultural Resources <br /> The proposed project expansion will not impact prehistoric or <br /> historic cultural resources at the project site. Much of the site <br /> has been disturbed by both currently permitted and historic mining <br /> activities. There are no prehistoric or historic cultural resources <br /> at the project site. No adverse environmental changes will result. <br /> 1.4 .8 Socio-Economics <br /> Limited potential for socio-economic impacts to population, <br /> housing, employment and revenues exists from the provision of <br /> additional jobs at the facility. The direct and indirect jobs <br /> generated and the related population and housing demand are <br /> expected to be insignificant. No adverse environmental changes will <br />" result. <br /> 1.4 .9 Aesthetics <br /> Portions of the currently permitted quarry operation and the <br /> proposed quarry expansion may be visible from sections of Waverly <br /> Road, and may be observed by persons driving to the sanitary <br /> landfill south of the project site. It is not anticipated that <br /> their aesthetic senses will be unduly impacted. <br /> The proposed project expansion will not cause increased impacts to <br /> aesthetics. No adverse environmental impacts or changes will occur. <br /> 6 <br /> CONDOR <br />