Laserfiche WebLink
for the refueling of mobile equipment. Storage is in a 10, 000 <br /> gallon fuel storage tank with a concrete berm for spill protection. <br /> Estimated number of employees: <br /> Construction Phase 0 <br /> Operational Phase(s) 6 <br /> Describe the proposed access to the project: <br /> Frontage on County/State Highway <br /> X Private Road Easement 30 ' width 1540 ' length <br /> X From what County or State Road? Waverly Road - <br /> (County Road) <br /> Prescriptive Easement <br /> Other (Explain) <br /> Describe off-site hauling of sand, aggregate, ore, waste, or other <br /> mined material: X Yes No If yes, specify: <br /> Stockpiled sand and rock aggregate will be hauled off-site as they <br /> are sold <br /> A. Number of one-way truck trips per day: Peak 100 Average 80 <br /> B. Number of one-way truck trips per week: Peak 500 Average 400 <br /> C. Primary public roads used for hauling: Waverly Road, Shelton <br /> Road west of Waverly Road, State Highway 26. <br /> Describe proposed on-site and off-site road improvements: <br /> A. On-site Width 37 ' Surface Dirt <br /> Location Haul road/Conveyor system from southern portion of <br /> lease holding to the processing plant <br /> B. Off-site Width 0 Surface - <br /> Location No off-site road improvements are proposed <br /> Describe the mined material recovery process (type of process, <br /> method, size and type of crushing equipment) : <br /> Near-surface rock and sand deposits are excavated using Front End <br /> Loaders (Troian 5500 Troian 3000, Caterpillar 980-C) , a <br /> Caterpillar D-8 Bottom Loading Scrapers, or equivalent. Excavated <br /> material is loaded onto haul trucks and delivered to the plant site <br /> centrally located on the property. Excavated material from the <br /> southern portion of the site will be delivered to the plant by <br /> conveyor or haul truck, with the access to be upgraded across an <br /> 5 <br /> CONDOR <br />