My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012635
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
8000
>
2600 - Land Use Program
>
QX-91-0006
>
SU0012635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 1:15:54 PM
Creation date
11/14/2019 1:08:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012635
PE
2605
FACILITY_NAME
QX-91-0006
STREET_NUMBER
8000
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
ENTERED_DATE
11/14/2019 12:00:00 AM
SITE_LOCATION
8000 N WAVERLY RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
existing check dam. <br /> Excavated rock and sand are processed at the plant by washing, <br /> crushing, rolling, conveying and screeninct. This process classifies <br /> the raw materials into fill sand, clean sand, and rock aggregate <br /> products, which are sold for construction purposes such as road <br /> base, shoulder aggregates, decorative rock, and concrete-related <br /> products. Up to 5% of the raw feed to the plant is currently wasted <br /> as fines. Processed material is stockpiled on-site in the form of <br /> rock aggregate and sand. Once sold, the final product is then <br /> transported off-site by haul truck. Off-site transport of final <br /> product will be undertaken by subcontractors. Topsoil will not be <br /> removed from the project site. <br /> Please refer to Appendix I for process flow diagrams, stationary <br /> equipment list, mobile equipment list, and process flow summaries <br /> for the mined material recovery process <br /> Location of the Recovery Process (es) : <br /> On-site, in the central portion of the lease holding, about 2000 ' <br /> east of Waverly Road. The area for material processing, <br /> stockpiling, and storage/recycling of process waters covers <br /> approximately 43 acres. <br /> Mining Activities Operating Hours Days of the Week <br /> Blasting None None <br /> Off-site hauling 6 am to 9 pm Mon - Sat <br /> Ore Extraction 5 am to 9 pm Mon - Sat <br /> Crushing/Processing 5 am to 9 pm Mon - Sat <br /> Other (Specify) <br /> Industrial Water Requirements: Will not increase above current <br /> usages <br /> Amount required per day: 3600 gpm (gallons per minute) <br /> Source: 2800 qpm recycled water from existing 3 pond cycle <br /> system 800 qpm "make-up" water from an on-site well <br /> Source of Domestic Water: <br /> Private Well X Water District (Specify) <br /> Other Potable water provided bottled on-site <br /> ;•' 6 <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.