Laserfiche WebLink
Item No . 4 <br /> PC : 1-17-85 <br /> EP-81-9 <br /> Page 4 <br /> PROPOSED MODIFICATIONS OF CONDITIONS : #' s 1 , 2 , 3 , 4, and 7 <br /> EP-81-9 <br /> STOCKTON SAND AND GRAVEL <br /> 1 . This permit shall expire no later than fifeeen years from the <br /> date of conditional approval . <br /> 2 . All proposed excavation and rehabilitation shall be completed <br /> prior to expiration of this permit in accordance with the <br /> revised Excavation and Rehabilitation Schedule submitted as <br /> part of the proposed modification. <br /> 3 . Standard Excavation Conditions : The Hours of Operation sec- <br /> tion is modified to read: Excavation of approved areas <br /> within the 1320 ' setback line shown on the site plan shall be <br /> beween the hours of 8 :00 a.m. to 5 :00 p.m. , Monday through <br /> Friday. Excavation and processing of excavated materials <br /> outside the 1320 ' setback line shown on the site plan may be <br /> conducted between 5 :00 a.m. and 9 :00 p.m. , Monday through <br /> Saturday. <br /> 4 . The existing uncompleted processing structure shall be preci- <br /> sely located on a revised site plan, and all other processing <br /> equipment shall be located east of the 1320' setback line <br /> shown on the site plan. <br /> 7 . Standard Quarry Excavation Development Requirements per <br /> Section 9-2244 of the Planning Title shall apply. <br />