My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012521
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SOUTHLAND
>
8080
>
2600 - Land Use Program
>
PA-1900183
>
SU0012521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 12:19:43 AM
Creation date
11/18/2019 1:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012521
PE
2690
FACILITY_NAME
PA-1900183
STREET_NUMBER
8080
Direction
E
STREET_NAME
SOUTHLAND
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20809026, 20809027
ENTERED_DATE
9/3/2019 12:00:00 AM
SITE_LOCATION
8080 E SOUTHLAND RD
RECEIVED_DATE
9/3/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company' <br /> proper clearance. Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible. Road intersections will not be allowed within the transmission easement. <br /> 9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by <br /> PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are <br /> not allowed. Construction plans must be submitted to PG&E for review and approval prior to the <br /> commencement of any construction. <br /> 10. Signs:Signs are not allowed except in rare cases subject to individual review by PG&E. <br /> 11. Recreation Areas: Playgrounds, parks,tennis courts, basketball courts, barbecue and light <br /> trucks(pickups,vans,etc.)may be allowed; subject to review of plans.Heavy equipment <br /> access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by <br /> at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at <br /> developer's expense AND to PG&E specifications. <br /> 12. Construction Activity: Since construction activity will take place near PG&E's overhead <br /> electric lines, please be advised it is the contractor's responsibility to be aware of, and observe <br /> the minimum clearances for both workers and equipment operating near high voltage electric <br /> lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety(https://www.dir.ca.gov/Title8/sb5 2g html), as well as any other safety regulations. <br /> Contractors shall comply with California Public Utilities Commission General Order 95 <br /> (litti)://www.cpuc.ca.gov/,gos/GO95/�o 95 startup pa e.l�)and all other safety rules. No <br /> construction may occur within 25 feet of PG&E's towers. All excavation activities may only <br /> commence after 811 protocols has been followed. <br /> Contractor shall ensure the protection of PG&E's towers and poles from vehicular damage by <br /> (installing protective barriers)Plans for protection barriers must be approved by PG&E prior to <br /> construction. <br /> 13. PG&E is also the owner of distribution facilities throughout many of the areas within the <br /> state of California.Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable <br /> operation of its facilities. <br /> PG&E Gas and Electric Facilities Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.