Laserfiche WebLink
11. Parking spaces will be required to accommodate persons with disabilities in compliance with <br /> Chapter 11 B of the California Building Code. Note that accessible parking spaces are required <br /> for each phase of the project. These parking space(s) shall be located as close as possible to <br /> the primary entrance to the building. <br /> 12. Adequate sanitary facilities shall be provided for the facility, per the requirements of Chapter 4 <br /> of the California Plumbing Code. <br /> 13. This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, Title 23, Division 2, Chapter 2.7. <br /> m. CALIFORNIA FIRE CODE: The following California Fire Code (CFC) will be applicable to the <br /> proposed project. The following conditions shall be addressed prior to submittal of a building permit <br /> application to the Building Inspection Division. <br /> 1. CFC 507 Fire Protection Water Supply-Fire flow and hydrants shall be provided for the proposed <br /> project by the use of: CFC Appendix B. <br /> 2. If Fire Protection Systems are required they shall be installed according to the CFC, Chapter 9 <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building Code <br /> and the California Electrical Code. <br /> 3. CFC, Section 503 Fire Apparatus Access Road - Shall be provided as required by this section. <br /> 503.1.2-A secondary access may be required. <br /> 4. CFC, Section 906 Portable Fire Extinguishers—Provide portable fire extinguishers as required by <br /> this section. <br /> 5. CFC, Section 506 Key Box - A Knox@ Box shall be installed according to the local fire <br /> department's instructions. Make application for the key box at the fire district having jurisdiction of <br /> this project. If there is an electronically controlled access gate at this site a Knox@ key switch will <br /> also be required. <br /> 6. CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> 7. A complete review at building permit submittal will require compliance with applicable codes and <br /> ordinances. <br /> 8. CFC, Section 105 Permits: Operational Permit(s) may be required prior to occupancy. <br /> n. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]468-3000, see memo dated September 24,2019.) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209]468-3420, see memo dated September 19, <br /> 2019.) <br /> 4, SAN JOAQUIN COUNCIL OF GOVERNMENTS (Contact: [209] 235-0600, see memo dated June 5, <br /> 2019.) <br /> 5. SOUTH SAN JOAQUIN IRRIGATION DISTRICT (Contact: [209]249-2600, see memo dated September <br /> 5, 2019.) <br /> PA-1900082 and PA-1900083—Conditions of Approval 5 <br />