My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
2200 - Hazardous Waste Program
>
PR0514024
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 2:17:49 PM
Creation date
11/19/2019 2:04:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514024
PE
2220
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
01
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rA <br />:3.1 <br />7. Notice in deed to property. <br />_The owner of the property on which the facility is located shall <br />record, in accordance with California law, a notation on the <br />deed to the facility property --or on some other instrument which is <br />normally examined during title search --that will in perpetuity <br />notify any potential purchaser of the property that: (1) the land <br />has been used to manage hazardous waste, and (2) its use is <br />restricted under Item 4(c). <br />8. Cost estimate for post -closure monitoring and maintenance. <br />(a) The owner or operator shall have a written estimate of the <br />annual cost of post -closure monitoring and maintenance of <br />the facility. The owner or operator shall keep this estimate, <br />and all subsequent estimates required in this Item, at the <br />facility. <br />(b) The owner or operator shall prepare a new annual post - <br />closure cost estimate whenever a change in the post -closure <br />plan affects the cost of post -closure care. The latest <br />post -closure cost estimate is calculated by multiplying the <br />latest annual post -closure cost estimate by 30. <br />(c) Annually during the operating life of the facility, the owner <br />or operator shall adjust the latest post -closure cost estimate <br />using the inflation factor calculated as described elsewhere <br />in this document. The adjusted post -closure cost estimate <br />shall equal the latest post -closure cost estimate times the <br />inflation factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.