My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPERRY
>
1051
>
2200 - Hazardous Waste Program
>
PR0514024
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 2:17:49 PM
Creation date
11/19/2019 2:04:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514024
PE
2220
FACILITY_ID
FA0004231
FACILITY_NAME
J M EAGLE (WS)
STREET_NUMBER
1051
STREET_NAME
SPERRY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17728039
CURRENT_STATUS
01
SITE_LOCATION
1051 SPERRY RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />IX. LANDFILL <br />1. Operation. <br />(a) By November 19, 1981, run-on shall be diverted away from <br />the active portions of the landfill; <br />(b) By November 19, 1981, run-off from active portions of <br />the landfill shall be collected. <br />(c) The owner or operator shall cover or otherwise manage the <br />landfill so that wind dispersal of hazardous waste is <br />prevented. <br />2. Surveying and recordkeeping. <br />The owner or operator shall maintain the following items in the <br />operating record: <br />(a) On a map, the exact location and dimensions, including depth, <br />of each cell with respect to permanently surveyed benchmarks; and <br />(b) The contents of each cell and the approximate location of <br />each hazardous waste type within each cell. <br />3. Closure and post -closure. <br />(a) The owner or operator shall place a final cover over the <br />landfill, and the closure plan shall specify the function <br />and design of the cover. In the post -closure plan, the <br />owner or operator shall include the post -closure care <br />requirements of Item 3(d). <br />(b) In the closure and post -closure plans, the owner or operator <br />shall address the following objectives and indicate how they <br />will be achieved: <br />(1) Control of pollutant migration from the facility via <br />ground water, surface water,and air; <br />(2) Control of surface water infiltration, including prevention <br />of pooling; and <br />(3) Prevention of erosion. <br />(c) The owner or operator shall consider at least the following <br />factors in addressing the closure and post -closure care <br />objectives of Item 3(b): <br />(1) Type and amount of hazardous waste and hazardous waste <br />constituents in the landfill; <br />
The URL can be used to link to this page
Your browser does not support the video tag.