My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:36:09 PM
Creation date
11/19/2019 2:48:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_S,tep 2 - Dry Fit All Components <br /> A. Dry fit your tank riser to verify your measurements. After you have dry fitted all <br /> components and are satisfied with your measurements, apply an approved fuel resistant, non <br /> hardening thread sealant (pipe dope) to the NPT threads on both ends of the tank risers. <br /> Step 3 — Install Tank Risers <br /> A. Install and torque the tank risers into the tank bungs. <br /> For Replacing Existing Phil-Tite 85000 series Spill Containers with 85000-1 series <br /> Spill Containers <br /> Step 1 - Determining The Correct Tank Riser length for Spill Container Installation <br /> A. Existing tank risers with NO M/F 4X4 riser adaptor installed. — Using a tape measure, <br /> measure from the top of your riser to finish grade and/or top of the manway cover. Record <br /> this measurement. For Fill spill containers this measurement should be 18-1/8" from the <br /> tom of the riser to finish grade. For Vapor Spill Containers this measurement should be 18" <br /> from top of riser to finish grade. If these measurements are less than the above <br /> measurements you must shorten your riser to meet these measurements. These <br /> measurements allow for an M/F 4X4 Riser Adaptor to be installed on top of the tank riser <br /> before the spill container is installed. If you are not installing an M/F 4X4, add 1-3/4" to <br /> your riser length. <br /> Remember, from finish grade to the top of the M/F 4X4 adaptor installed on the riser <br /> should be 16-318" for Fill spill containers. See Figure 1. <br /> B. Existing tank risers with M/F 4X4 riser adaptor installed — Using a tape measurer, measure <br /> from the top of the M/F 4X4 riser adaptor to finish grade and/or to the top of the stainless <br /> steel sleeve. Record this measurement. For Fill Spill Containers this measure must be <br /> greater than or equal to 16-3/8" (16 3/8" — 20 1/8"), and for Vapor Spill Containers this <br /> measurement must be greater than or equal to 16 1/4" (16 1/4" — 20"). <br /> C. If your existing riser is to long, there are several possible ways you can shorten them. <br /> Some possible methods are: <br /> 1) Remove the nipple that would have been installed prior to 2001 under the pre-EVR <br /> Installation Instructions and install a shorter nipple. Especially helpful for direct <br /> buried spill containers. <br /> 2) For multi-port systems, remove the existing riser(s) and install the correct length <br /> riser(s). Use an M-1600 riser support bracket to maintain alignment 16" on center <br /> between the fill and vapor riser. <br /> 3) For direct buried risers with no nipple and coupler you maybe able to excavate down <br /> to tank top using a 10" to 11" OD PVC pipe placed over the 4" riser. Then remove <br /> the backfill material as you lower the pipe down over the riser. When you have <br /> reached tank top remove the 4" riser and install the correct length 4" riser per <br /> following Steps 2 & 3. After you have installed the tank riser gradually remove the <br /> 10" — 11" OD PVC pipe as you back fill the space between the 4" riser and the 10 — <br /> 11" OD PVC pipe. <br /> 2of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.