My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1137
>
2300 - Underground Storage Tank Program
>
PR0530093
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:36:09 PM
Creation date
11/19/2019 2:48:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0530093
PE
2351
FACILITY_ID
FA0019793
FACILITY_NAME
CRUISERS MANTECA #29
STREET_NUMBER
1137
Direction
W
STREET_NAME
LATHROP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19724002
CURRENT_STATUS
01
SITE_LOCATION
1137 W LATHROP RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 2 - Installing the Black Spill Container onto the M/F 4X4 Riser Adaptor <br /> A. By hand, thread the black spill container onto the male threads of the M/F 4X4 riser adapter <br /> taking care not to cross thread the spill container riser. These threads are straight threads not <br /> NPT pipe threads. The spill container must screw down and seat on the top of the drop tube <br /> flare (Fill) or on the top of the M/F 4X4 riser adaptor sealing surface (Vapor). <br /> Step 3 —Tightening the Spill Container <br /> Using a '/z" drive torque wrench and the Black tool adapter (T-7101 or T-7002, Black) from <br /> Phil-Tite T-7043 Tool Kit, tighten the Spill Container onto the M/F 4X4 Riser Adaptor threads to <br /> a torque value between 75 and 100 ft. Ibs. <br /> Step 4 — Final Installation <br /> Check the measurement from the top of the black spill container to the top of the stainless <br /> steel sleeve at finish grade. Ensure there is at least 1 1/4" inches of clearance (more is OK) <br /> from the top of the black spill container to the top of the stainless steel sleeve at finish grade. <br /> This will allow for the water tight cast iron lid to fit properly and ensure that the spill container <br /> and tank riser are not in direct contact with the cast iron lid. This ensures the concrete with <br /> manway cover are not load bearing onto the tank fill and vapor risers. <br /> Step 5 — Drain Valve Testing <br /> Test the drain valve assembly as described in CARB procedure TP-201.1 D. <br /> Step 6 —After Spill Container Installation <br /> The spill container is now ready for the installation of the rotatable (swivel) adaptor and dust <br /> cap. Install the fill and/or vapor swivel adaptor using the SWF-1008/SWV-101 B Installation <br /> Instructions. <br /> 4of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.