Laserfiche WebLink
i <br /> i <br /> i <br /> i <br /> D. Results of TestingfServicin ' <br /> Software Version Installed; <br /> Complete the following checklist: I <br /> X Yes tl No' Is the audible alarm operational? <br /> X Yes n No' Is the visual alarm operational? <br /> I <br /> X Yes I.) No' Were all sensors visually Inspected,functionally tested,and confirmed operational? <br /> X Yes n No` Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their <br /> ro er o erasion? <br /> X Yes o No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? I <br /> X WA I ! <br /> X Yes O No' For pressurized piping systems, does the turbine automatically shut down If the piping secondary containment monitoring system <br /> WA detects a leak,falls to operate,or is electrically disconnected? If yes:which sensors Initiate positive shut-down? (Check all that apply) <br /> X Sump[Trench Sensors; Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> faflure/disconnection? X Yes; n No. <br /> X Yes n No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(I.e.no mechanical overfill prevention <br /> NIA valve is installed),Is the overfill warning alarm visible and audible at the tank fill polnt(s)and operating property? If so,at what percent <br /> of tank capacity does the alarm trigger? 95 % <br /> X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> Yes' manufacturer name and model for all replacement parts In Section E below. <br /> X Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)D Product, X Water. If <br /> es descr be causes In Section E below. <br /> X Yes U No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes n No' Is all monitoring equipment operational per manufacturer's specifications? <br /> i <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: _REMOVED WATER FROM ALL SUMPS THAT HAD <br /> WATER. _ 1 <br /> _ I <br /> I <br /> _ I <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/2 1/07 <br />