Laserfiche WebLink
TABLE OF CONTENTS <br /> SWRCB Requirement for VPH Communication <br /> TOP OFF METHOD TANK SUMPS ............................................................................................ 1. <br /> VACUUM METHOD TANK SUMPS.............................................................................................. 2. <br /> TOP OFF METHOD UDC SUMPS............................................................................................... 3. <br /> VACUUM METHOD UDC SUMPS............................................................................................... 4. <br /> SUMP SHOWING COMMUNICATION......................................................................................... 5. <br /> A D interstice sump will require 2 sensors. One sensor, which resides in a bung supplied in the <br /> UDN to monitor the integrity of the interstice. The second sensor is to monitor liquid level that <br /> the sump itself is catching and sits open to the bottom. <br /> For a Dry Interstice Sumps, there is a requirement for 2 monitoring sensors. One is to monitor the <br /> interior of the sump liquid level that the sump itself is containing in a breach it shall be positioned in <br /> the open bottom at the lowest point of a sump. <br /> State Water Board for VPH <br /> Communication testing on VPH components stems from demonstrating that the monitoring system <br /> is "capable of detecting the entry of the liquid- or vapor-phase of the hazardous substance stored in <br /> the primary containment into the secondary containment and capable of detecting water intrusion into <br /> the secondary containment." In addition, "the interstitial space of the underground storage tank shall <br /> be maintained under constant vacuum or pressure such that a breach in the primary or secondary <br /> containment is detected before the liquid or vapor phase of the hazardous substance stored in the <br /> underground storage tank is released into the environment." <br /> re <br /> ealth and Safety Code, div.3, ch. 6.7, §§ 25290.1(d)&(e).) <br /> sting communication during a monitoring system certification is necessary to make sure that the <br /> monitoring system is working as required by UST requirements and is monitoring the entire containment. <br /> As you know, installation, testing, maintenance, and operation of UST components should follow <br /> manufacturer guidelines. I see no problems with your proposed method of testing for communication <br /> on your sumps. <br /> 0�9) <br /> PROBLEM SOLVED <br /> I. <br />