My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:22:36 PM
Creation date
11/20/2019 2:56:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�9 <br />' Upgradien6 "nvironmental Coultants <br />' January 27, 2004 _ <br /> Mr. Tom O'Neill JAN <br /> Valley Motors T <br /> P. O. Box 923 ENvIR�NIy,! .�,�G1 <br /> Stockton,CA 95201 <br /> PERM L„ <br /> Subject: Cost Pre-approval Package r <br /> Dear Tom: <br /> As you have requested,we have prepared the enclosed bid package for submission to the <br /> 'State UST Cleanup Fund Program for pre-approval. The package includes the required <br /> T documentation that Upgradient Environmental has submitted a plan on your behalf to <br /> perform soil remediation using vapor extraction technology at Valley Motors. Also <br /> included is a copy of the December 19, 2003 letter from San Joaquin County's <br /> Environmental Health Department approving the plan. At the request of Mr. Michael <br /> Infurna of EHD,we have already contacted the San Joaquin Valley Air Quality <br /> Management District to begin the permitting process. It is our understanding that the <br /> permitting process normally takes at least 60 days, and perhaps longer. <br /> Please note that the cost estimate of$60,900 is for the installation and operation of the <br /> extraction system for up-to 6 months. If EHD determines that the system must be <br /> operated for a longer time period, the monthly O&M-cost (as shown)will be $6,000. This <br /> cost does not include the cost of electricity or any natural gas or other supplemental fuel <br /> that may be required to operate the extraction unit. Such costs can only be determined - <br /> I <br /> after the system is on line and operating. We will attempt to have these costs billed <br /> directly to Valley Motors to avoid our contractor mark-up and/or finance costs. j <br /> j <br /> Please ask Mrs. Hyduke, as the Responsible Parry,to sign the enclosed Cost Pre-approval <br /> Request and then forward the package to Mr. Mark Owens at the State Underground <br /> Tank Cleanup Fund. I have enclosed a mailing envelope for your convenience. . <br /> I <br /> -- = <br /> Please.call-aur-office-ifyou have any further questions. <br /> Si-rAerel,y, <br /> Victor B. Cherven,Ph. D. <br /> Principal Geologist. <br /> Attachment <br /> Cc: Michael IYfurna,EHD j <br /> James Barton,Regional Water Quality Control Board ' <br /> Stockton: P.D..Box 8002, Stockton, CA 95208 (209) 772-3620 <br /> Cameron Park: 3369 Kimberly Road, Cameron Park, CA 95682 (530) 677-3055 <br />
The URL can be used to link to this page
Your browser does not support the video tag.