My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:22:36 PM
Creation date
11/20/2019 2:56:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Thomas O'neill <br /> Andrew S. Hyduke -2- <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> Vapor Survey(34 Points) 4,555 <br /> Drill/Install Two 50 feet 16,248 Per Fund Regulations,laboratory <br /> Borings and One 65 feet Well analyses for chlorinated HC are <br /> excluded. <br /> t_ Four-Quarters-of_Gr-oundwater= <br /> 1-0;8$6--Same-Comment.- — - ---— - <br /> Monitoring and Sampling of <br /> Four Wells <br /> 4th Quarter 1997 of 0 Costs has already incurred prior to <br /> Groundwater Monitoring and submittal for pre-approval. <br /> Sampling(3 Wells) Therefore,no pre-approval for this <br /> portion is made, and the costs are <br /> subject to adjustment during <br /> reimbursement reviews. <br /> TOTAL PRE-APPROVED $31,689 <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services, do not hesitate to <br /> calf me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. To make this easier, ensure thatyour consultantprepares his invoices to match <br /> the format of the original estimate with an attached copy of the appropriate pre-approved letter, and <br /> provides reasonable explanations for any changes made in-the scope of work. THien the invoices are <br /> submitted you must include copies of all: <br /> • subcontractor invoices, ' <br /> technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions. I can be reached at(916)227-6010. <br /> Sincerely, <br /> Teresa Trinh,WRCE <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> 15y Our mission is to preserve and enhance the quality of California's water resources,and <br /> 7?a� Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.