My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:22:36 PM
Creation date
11/20/2019 2:56:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`•�--� 5Ep O'ref <br /> �� L/ � . <br /> ._._..—_ t `.-I i.�.!1�• i ,LHEA L 7 Y I OSI IFOPN� <br /> L'(lLM o Pete Wilson <br /> =t JAH 27 P1. `: 0 Governor <br /> January 21, 1998 <br /> State Water <br /> Resources <br /> Control Board <br /> Division of Thomas O'neill <br /> Clean Water Andrew S.Hyduke <br /> Programs P O Box 923 <br /> Stockton,CA 95201 <br /> Mailing Address: <br /> P.O.Box 944212 <br /> .Sacramento,CA -- <br /> - PRE-APPR0VA`L OF'CORRECTIVE�ACTION COSTS,CLAIM NO. 12540, <br /> 94244-2120 i <br /> SITE ADDRESS: 800 MAIN ST E,STOCKTON,CA 95202 <br /> 2014 T Street, <br /> Suite 130 I have reviewed your request,received on December 1, 1997,for pre-approval of corrective action costs. <br /> Sacramento,CA <br /> 95814 1 will place these documents in your file for future reference. I have included a copy of the"Cost Pre- <br /> (916)227-6010 Approval Request"form. Please use this form in the future for requesting pre-approval of corrective <br /> FAX(916)227-4530 action costs. <br /> World Wide Web <br /> http://www.swrcb.ca. With the following provisions,the total cost pre-approved for completing the October 16, 1997, <br /> gov/-cwphome/ Upgradient Environmental Consultants workplan and the addendum dated November 3, 1997,approved <br /> fundhome.htm <br /> by the San Joaquin County EHD(County)in their October 29, 1997 letter,is$31,689;see the table below <br /> for a breakdown of costs. Per Fund Regulations,costs associated with investigating and remediating non- <br /> petroleum contaminants are not eligible for funding. The Fund is only authorized to reimburse reasonable <br /> and necessary corrective action costs resulting from an eligible,petroleum release. As such,the analytical <br /> ;testing costs for chlorinated hydrocarbon are excluded and not pre-approved.—Upon completion of each <br /> phase of work,you are required to submit a copy of the results to the County Jand Fund for reviews. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved in <br /> this letter. <br /> The actual costs and scope of work perfoimed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Upgradient Environmental Consultants proposal in my pre-approval <br /> above,please be aware that you will be entering into a private contract: the State of California cannot <br /> compel you to sign any specific contract. This letter pre-approves the costs as presented in the <br /> proposal dated November 5, 1997 by Upgradient Environmental Consultants for conducting the work <br /> approved by the County for implementing the October 16, 1997,.Upgradient Environmental <br /> Consultants workplan. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action mast meet the requirements of <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> �a+♦ Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.