My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:14:03 PM
Creation date
11/20/2019 3:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amount incurred by Upgradient in fiscal year 2010 and <br /> invoiced to.Valley Motors: 4,91630 <br /> Amount incurred by Upgradient in fiscal year 2011 but <br /> not yet-invoiced to Valley Motors: 6;819.33 <br /> Total outstanding.balance: $100,906.04 <br /> In addition to that total, Upgradient Environmental estimates that the minimum <br /> cost to complete the aquifer test is.as;follows: <br /> Hook up extraction well, pump 10;000 gallons (no.sampling): .. $2,300.00 <br /> Analyze data and prepare report: 2,000.00_ <br /> i erfcrm% ,r quarter morii'oring,prellare report: �� 3,500.00: <br /> Total'additional charges in 2011: 7,800.00 <br /> (Note: this would bring the total charges for'the 2011-2012 fiscal year to $14,619.33, <br /> which is $4,619.33 more than the budget approved�for expenditure by the UST'Fund). . <br /> However, if additional activities are required, such as mobilizing an additional <br /> water storage`tank as previously proposed in the work plan,and approve_d by.EHD, <br /> collecting and analyzing.water samples from the aquifer test to.comply with.Sanitation <br /> District disposal regi irements, emptying the storage tanks, and retaining a licensed <br /> surveyor to survey all well locations,the estimated additional costs would be,as follows: <br /> Estimated additional charges in 2011:. , $8,500.00, <br /> -In addition to all of the above-,the minimum estimated charge to prepare a-report <br /> for the second quarter of 2012 (letter report only, iio samples) and assignable to the UST <br /> Fund fiscal year 2011-2012'budget would be as follows: <br /> r.?port,,-2"a(!uarter-201 <- 5900.QQ <br /> If the potential add'it'ional charges ($8,500) and the 2"d quarter report($400) are - <br /> added to the previous total,then the total potential charges for fiscal year 20'11-2012 <br /> would be: <br /> Total potential charges for 2011-2012: $23,519.33 <br /> This amount is more than twice the budget'approved by-the UST Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.