Laserfiche WebLink
h'q K L E IN FELDER <br /> i— <br /> I 8 LIMITATIONS <br /> Phase I ESAs are non-comprehensive by nature and are unlikely to identify all environmental <br /> i problems or eliminate all risk. The attached report is a qualitative assessment. Kleinfelder offers <br /> a range of investigative and en( incermu services to suit the needs of our clients, including more <br /> quantitative investigations. Although risk can never be eliminated, more detailed and extensive <br /> investigations yield more information. which may help you understand and better manage your <br /> risks. Since such detailed services involve greater expense, we ask our clients to participate in <br /> identifying the level of service, which \vIII provide them with an acceptable level of risk. Please <br /> contact the signatories of this report if you would like to discuss this issue of risk further. <br /> r The scope of work on this project was presented in our proposal and contract number 20-YP9- <br /> 192, dated July 23, 1999 and subsequently approved by Mr. Peter Lindberg as our client. Please <br /> be aware our scope of work \vas limited to those items specifically identified 'in the proposal. <br /> Environmental issues not specifically addressed in the proposal or this report were beyond the <br /> scope of our work and not included in our evaluation. <br /> Kleinfelder performed this environmental assessment in general accordance with the guidelines <br /> set forth in the ASTM Standard Practice for Environmental Site Assessments: Phase I <br /> Environmental Site Assessment Process (Designation E-1527-97) and our above-referenced <br /> proposal which was subsequently approved by Mr. Peter Lindberg, as our client. No warranty. <br /> either express or implied is made. Environmental issues not specifically addressed in the report <br /> f were beyond the scope of Our west: and not included in our evaluation. <br /> ILand use, site conditions (both on-site and off-site) and other factors will change over time. <br /> Since site activities and regulations beyond our control could change at any time after the <br /> completion of this report. our observations, findings and opinions can be considered valid only as <br /> of the date of the site visit. This report should not be relied upon after 180 days from the date of <br /> f its issuance (ASTM Standard E-1527. Section 4.5). <br /> L <br /> The property owner and/or client is solely responsible for notifying all governmental agencies. <br /> and the public at large. of the existence. release, treatment or disposal of any hazardous materials <br /> observed at the project site. either hefore or during performance of Kleinfelder's services. <br /> Kleinfelder assumes no responsibility or liability whatsoever for any claim, loss of property <br /> value, damage, or injury which results from pre-existing hazardous materials being encountered <br /> or present of the project site. or from the discovery of such hazardous materials. <br /> L <br /> t <br /> i 20-4354-01.1)01/2017R.761 Page 19of20 <br /> Copyright 1999 Kleinfelder. Inc. September 7. 1999 <br />