My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
REMOVAL_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:00:08 PM
Creation date
11/25/2019 11:51:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2014
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Decontaminate victim without delaying life-saving procedures. <br /> 4. If victim's condition appears to be non-critical, but seems to be more severe than minor cuts, <br /> he/she should be transported to the nearest hospital by trained Emergency Medical Services (EMS) <br /> personnel: let the doctor assume the responsibility for determining the severity of the injury. If the <br /> condition is obviously serious, EMS.must transport the victim. <br /> 5. For minor cuts that require more than jobsite first aid, the victim should be transported to a local <br /> Workers Comp Clinic by a company employee.Never allow the victim to drive himself. <br /> 6..Notify the Project Manager. Complete the applicable Incident Reporting Forms within 24 hrs. <br /> XII. INCIDENT NOTIFICATION PROTOCOL <br /> 1. All incidents need to be reported immediately to the Contractor's Project Manager. <br /> 2. Project Manager is to report incident to Client Project Manager and complete Incident report <br /> within 24 hours. <br /> 3. Project Manager to begin accident investigation,take statements and document findings on <br /> Employers accident investigation forms. <br /> 4. On completion of investigation,retraining or controls are to be set in place as necessary to <br /> mitigate any future repeat of incident. <br /> XIII. DOCUMENTATION <br /> Documentation is to be kept daily by the SSO. Any incidents or near misses are to be documented <br /> and reported immediately. <br /> SSO to insure anyone entering into the site must sign in & out. <br /> Addendums <br /> A. Hospital Map <br /> B. Sign in sheet and acknowledgement Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.