My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012627 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
11105
>
2600 - Land Use Program
>
PA-1900240
>
SU0012627 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 9:47:31 AM
Creation date
11/26/2019 9:14:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012627
PE
2633
FACILITY_NAME
PA-1900240
STREET_NUMBER
11105
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908007, 05908029, 05908030
ENTERED_DATE
11/1/2019 12:00:00 AM
SITE_LOCATION
11105 N HAM LN
RECEIVED_DATE
11/1/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Jolley <br /> February 13, 2020 <br /> Page 10 of 15 <br /> This study will be conducted pursuant to compliance with the California Environmental Quality Act (CEQA) <br /> and with Section 106 of the National Historic Preservation Act (NHPA) for the identification of cultural <br /> resources. <br /> A summary of the findings will be provided in an inventory and evaluation report, following OHP's <br /> recommended content and format. The report will provide the historic context, which is also necessary for <br /> incorporation into the CEQA document, as well as the methods, results, and recommendations. <br /> All work will be conducted by, or under the direct supervision of, a Registered Professional Archaeologist <br /> who meets the Secretary of the Interior's Professional Qualifications Standards for prehistoric and historic <br /> archaeology.The draft report will be submitted to the client, electronically, within 60 days of the receipt of <br /> a notice to proceed and fully executed contract. <br /> Assumptions. <br /> No more than three cultural resources will be identified or recorded as part of the field survey.If <br /> additional sites or resources are identified as a result of the record search or survey, then a contract <br /> amendment will be required to record, test, and/or evaluate the additional resources. <br /> This scope assumes the evaluation of up to three resources will not require archaeological testing. <br /> This scope does not include archaeological testing or collection of resources.A scope and cost for these <br /> activities cannot be established until completion of the cultural resources inventory and records search <br /> and may be completed under contract amendment. <br /> The Client will notify ECORP of any hazards in the Project Area.Adverse weather conditions in the Project <br /> Area may delay field survey until ground conditions are suitable for fieldwork. <br /> Project meetings, hard copies of reports, responses to comments, and other tasks not specified above will <br /> require a contract change order. <br /> In compliance with the terms of agreement between ECORP and the OHP, one unbound copy of the final <br /> report will be submitted to the appropriate confidential OHP Information Center within 60 days of <br /> completion, where it will be archived and remain confidential (note that this is required, regardless of <br /> project status, and does not affect project approval). <br /> Task 2D: Energy <br /> To better integrate the energy analysis with the rest of CEQA, the Governor's Office of Planning Research <br /> (OPR) has added relevant questions regarding potential energy impacts to the sample environmental <br /> checklist in Appendix G. ECORP proposes to analyze Project energy consumption in the body of the EIR, <br /> where potential impacts related to Project energy consumption will be assessed against OPR's proposed <br /> standards of significance; i.e., whether the Project result in the wasteful, inefficient, or unnecessary <br /> consumption of energy, or wasteful use of energy resources; and, whether the Project would conflict with <br /> an applicable plan for renewable energy or energy efficiency.There are no established thresholds of <br /> 10 <br /> ECORP Consulting,Inc. <br /> EN'l'ERONNENTAL CONSI:LIRN-l5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.