Laserfiche WebLink
Charter Way ARCO 440 W. Dr. MLK, Jr. Blvd., Stockton SR0071056, revised <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4. Since concrete will be broken near the existing UST system, a secondary containment <br /> test must be performed on the affected UST and or piping once concrete is poured in <br /> accordance with the manufacturer's guidelines. <br /> 5. Secondary containment testing for the 87 and 91 lines and new UDC sumps are <br /> required six months after installation. Provide 48 hours notification to the EHD when this <br /> test is scheduled. <br /> 6. Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> a. Possess or be employed by a person who possesses one of several permissible <br /> valid, current contractor's licenses issued by the Contractors State License Board <br /> (may be issued to the installation company), or a Tank Tester's license issued to the <br /> individual by the State Water Board, and <br /> b. Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid, current California UST Service <br /> Technician certificate issued by the International Code Council (ICC), and <br /> c. Possesses a valid, current certificate of training from the manufacturer(s) of the <br /> component(s) being tested, repaired, or serviced. <br /> 7. Individuals installing underground storage tank system components must possess or <br /> work under the direct and personal supervision of an individual physically present at the <br /> work site who possesses all of the following: <br /> a. A valid, current contractor's license issued by the Contractors State License Board, <br /> and <br /> b. A valid, current UST Installation/Retrofitting certificate issued by the International <br /> Code Council (ICC), and <br /> c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br /> being installed. <br /> 8. Log into the California Environmental Reporting System (CERS), complete and submit a <br /> "UST Certification of Installation/Modification"form for the piping and sumps installed, <br /> within 30 days. <br /> 9. All components must be certified by an independent testing organization and labeled as <br /> required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br /> Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br /> 10. Permit expires 180 days from the date of approval. If an extension to the expiration date <br /> is required, a written request must be submitted to this office prior to the expiration date. <br /> If you have any further questions, please contact me at (209) 468-3440. <br /> Thank you, <br /> Stacy Rive , REHS <br /> Senior Registered Environmental Health Specialist <br /> ' Ors/-r? �, l�C�iitP� E!a-,-, //1/o 1v. Z*. <br /> 2 Ufa��"►')� �� Cl'2 20l� <br />