Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 333.05 <br /> Complete the followinq checklist: <br /> S Yes ❑ No' Is the audible alarm operational? <br /> S Yes ❑ No' Is the visual alarm operational? <br /> S Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> S Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operallonal? <br /> S N/A <br /> S Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system date=a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) S Sump/fmnch <br /> Sensors; S Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks InA sensor failure/disconnecfion? S Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> S N/A installed),is the overfill warning alarm visible and audible at the tank fill poings)and operating property? If so,at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes S No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement pans in Section E,below. <br /> ❑Yes' S No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> S Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports,if applicable <br /> S Yes ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />