My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2000 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:51:24 PM
Creation date
11/26/2019 1:07:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2011
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X� Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑ Pressure F Vacuum X❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vP1t Equipment Resolution: vplt to gph <br /> Sump# 1 REG Sump# 2 SUP Sump# Su nip# <br /> Sump Diameter: 4 8 4 8 ' <br /> Sump Depth: 71 7111 <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 1211 1211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1511 1511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1411 141 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both lYes[:]No❑N Yes�No�N Yes�No�N Yes�No�iA <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe [:] <br /> ail-safe ❑ � ❑ ❑ � [:] <br /> [:] � ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No A <br /> Was fail-safe verified to be ❑ [:]No[_ <br /> ❑ ❑ � ❑ ❑ � ❑ ❑ <br /> operational?* X Yes N X Yes N N X Yes N N X Yes[:]No[—]NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 9:26 9:24 <br /> Initial Reading(RI): 7.671 7.524 <br /> Test End Time: 9:56 9:54 <br /> Final Reading(RF): 7.336 7.524 <br /> Test Duration. 30min 30min <br /> Change in Reading(RF-RI ): .02gph .000gph <br /> Pass/Fail Threshold or Criteria: 05gph .05gph <br /> Test Result: Pass D Fail Pass D Fail E] Pass D Fail 0 Pass D Fail <br /> Was sensor removed for testing? EYes[_]NoLjNA X Yes NNA Yes N NA❑Yes❑No❑NA <br /> Was sensor properly replaced and NA ❑ e� �NA❑Yes❑ <br /> N A <br /> verified functional after testing? Ye N NA Ye N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.