Laserfiche WebLink
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard X� Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑ Pressure F Vacuum X❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vP1t Equipment Resolution: vplt to gph <br /> Sump# 1 REG Sump# 2 SUP Sump# Su nip# <br /> Sump Diameter: 4 8 4 8 ' <br /> Sump Depth: 71 7111 <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 1211 1211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 1511 1511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1411 141 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both lYes[:]No❑N Yes�No�N Yes�No�N Yes�No�iA <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe [:] <br /> ail-safe ❑ � ❑ ❑ � [:] <br /> [:] � ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No A <br /> Was fail-safe verified to be ❑ [:]No[_ <br /> ❑ ❑ � ❑ ❑ � ❑ ❑ <br /> operational?* X Yes N X Yes N N X Yes N N X Yes[:]No[—]NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 9:26 9:24 <br /> Initial Reading(RI): 7.671 7.524 <br /> Test End Time: 9:56 9:54 <br /> Final Reading(RF): 7.336 7.524 <br /> Test Duration. 30min 30min <br /> Change in Reading(RF-RI ): .02gph .000gph <br /> Pass/Fail Threshold or Criteria: 05gph .05gph <br /> Test Result: Pass D Fail Pass D Fail E] Pass D Fail 0 Pass D Fail <br /> Was sensor removed for testing? EYes[_]NoLjNA X Yes NNA Yes N NA❑Yes❑No❑NA <br /> Was sensor properly replaced and NA ❑ e� �NA❑Yes❑ <br /> N A <br /> verified functional after testing? Ye N NA Ye N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />