Laserfiche WebLink
'SWRCB,January 2002 p,i„c 3 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑X Tank Manufacturer FlIndustry Standard- Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: X� Pressure Vacuum Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 REG REG Piping Run# 2 SUP SUP Piping Run# Piping Run# <br /> Piping Material: fiberglass fiberglass <br /> Piping Manufacturer: smith smith <br /> Piping Diameter: 311 311 <br /> Length of Piping Run: 1401 1401 <br /> Product Stored: REGULAR SUPREME <br /> Method and location of sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 9:06 9:07 <br /> Initial Reading(RI ): 3psi 3psi <br /> Test End Time: 10:06 10:07 <br /> Final Reading(RF ): 3psi 3psi <br /> Test Duration: 1hr 1hr <br /> Change in Reading(RF-Rt ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Test Result: Pass E] Fail F-] Pass El Fail El Pass 1:1 Fail 1:1 Pass D Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />