My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:58 PM
Creation date
11/26/2019 2:28:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: RHL DESIGN GROUP; 7077656835; Dec-22-98 4: 13PM- Paye 24'27 <br /> 1Zl LL/MO ftl: LJ-LO r: n uvveoa�..... .•.. -•• -.- <br /> 7 <br /> ir.Y YtB��lV MAE% we=& 1111110MACTiCB111111 <br /> K.E. Curtis Construction Co., Inc.Corporate Safety and Health Program to remain on-site <br /> at all times. <br /> titY.p C�T�TfM <br /> Provisions will be made to ensure proper sanllation facilities for site personnel. <br /> OLN 3TANWAt>a "rN 0�iiT M �t1�CBlliMf�Bat <br /> K.E. Curtis Construction Co.. Inc. Corporate Safety and Health Program to remain on-site <br /> at all times. Special safety procedures for specific job tasks ore under this section. <br /> �A T>•v�NC ��BNB■7`r1 <br /> All site personnel assigned to this project will be required to dernonsfrnte they have <br /> completed training under 29 CFR 1910.120. <br /> All site personnel shrill hove completed training relative to the t.xoject operations plans, <br /> This formal training shall be supplemented ns required by safety breifings- fraining may <br /> include: <br /> A. Confined space entry <br /> B. Supplied air respiratory equipment <br /> C. Other: <br /> D. Other: <br /> Training required for this prcgect are hi-lited. All subcontractor personnel are required to <br /> omplete the some training and attend nil safety meetings. <br /> �S.A MBNC�fL fiCtiTtl�V.�2f8 <br /> All personnel must participate in a medical surveillance program if exposud ul or above <br /> the exposure limits of any hazardous material 30 or more days per year. Because we do <br /> not expect to meet or exceed this limit.no program has yet been established, <br /> However. physical examinations must have boon successfully confpieled in accordance <br /> with K.E.Cutis Construction Co.. Inc. Company Policy Nrior to working in the field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.