My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U:T SYSTEM DRAWING INFORMATION <br /> 1, _V/Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. _6/Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5_ Tank cross-sectional diagram. <br /> 6. _ Detail of rank, associated piping, excavation and cover. <br /> 7. —1--iank(s) and piping approved by a nationally recognized independent testing organization. CTitle 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> i <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (20) containment systems before covering. (Section 2635 (a) (3) & (4)) <br /> 11. Tank integrity test required upon completion of installation with rank in operating condition. Test results to be <br /> submitted directly to PHS-EHO from the testing company or owner of facility. (Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK x x 1 a 2 x # <br /> CAPACITY 12n. non 10 . 000 <br /> MANUFACTURER <br /> COMPOSITION STEEL FR STEEL FR <br /> MODEL <br /> PRODUCT UNLEADED SUPREME <br /> CORROSION PROTECTION <br /> U.L. LISTED YES YES <br /> COMPATIBILITY WITH 100% Y E S Y E S <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> X A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> �- (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank (Section 2635 (a) (2) (A)] <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.