My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERUROUND TANK INSTALLATION Page 4 <br /> Design for Anchorage Against Buoyancy ZWitgrn Guide <br /> STEP 8 -Determine Total Anchorage Load <br /> Determine the Total Anchorage Load by subtracting the Holddown Provided <br /> by Installation from the Design Uplift Force. If the Total Anchorage Load is a <br /> negative number then no anchorage is required for the Installed Condition <br /> and no further analysis is necessary. <br /> If the Total Anchorage Load is a positive number then anchorage is required. <br /> Proceed to Step 9. <br /> i 3 lbs. Design Uplift Force (25) <br /> 52(.7 lbs. Holddown Provided by Installation (38) <br /> ®t lbs. TOTAL ANCHORAGE LOAD <br /> STEP 9-Determine Holddown Available from Anchors <br /> Separately determine the weight of backfill and slab materials for both the <br /> wet and dry conditions for Zones 1, 2&3. This weight will be determined in <br /> terms of unit weight per square foot of plan area. Add all of the individual Dry HT,Zone 1 (13) ft. <br /> weights to determine the Holddown Available from Anchors. Wet HT,Zone 1 (14) 67 fL <br /> Height Unit WT Dry HT, Zone 2 (15) — ft. <br /> of area of Marl Wet HT, Zone 2 (16) ft. <br /> Q Unit weight of Dry Slab O C ft x 150.0 = lbs/sq ft Dry HT, Zone 3 (17) — ft. <br /> Q Unit weight of Wet Slab - (-7 ft x 87.6 = lbs/sq ft Wet HT, Zone 3 (18) o fL <br /> Q Unit weight of Dry Zone 2 ft x 100.0 = lbs/sq ft <br /> Q Unit weight of Wet Zone 2 C "63> ft x 37.6 = —G 1'T "Z lbs/sq ft <br /> © Unit weight of Dry Zone 3 O C:> ft x 100.0 = — lbs/sq ft <br /> © Unit weight of Wet Zone 3 ® �r - ft x 37.6 = z O 3 $ lbs/sq ft <br /> ® HOLDDOWN AVAILABLE FROM ANCHORS = 3 �cl lbs/sq ft <br /> x 2& G`6?S ft,tank length (5) <br /> Qi HOLDDOWN AVAILABLE FROM ONE ANCHOR = _ f `((�D� lbs/ft of width <br /> x 2 anchors per tank <br /> Q TOTAL HOLDDOWN AVAILABLE FROM ANCHORS = 7 Z 7 lbs/ft of width of each anchor <br /> STEP 10 -Determine Required Width of Deadman Anchors <br /> Determine the required width of deadman anchors by dividing the Total Anchorage Load by the Total <br /> Holddown Available from Anchors. This is the width of each deadman which must lie entirely outside the tank <br /> shadow. If the width of the tank shadow plus the width of the two deadman anchors exceeds the width of the <br /> concrete slab at grade then the concrete slab must be widened to at least the combined width of the tank plus <br /> the two deadman anchors. On multiple tank installations, the tank spacing must be at least the width of two <br /> deadman anchors side by side. <br /> lbs. Total Anchorage Load (39) <br /> + � Ibs/ft width Total Holddown Available from Anchors (48) <br /> 9- 1,7 ft. REQUIRED WIDTH OF DEADMAN ANCHORS <br />
The URL can be used to link to this page
Your browser does not support the video tag.