My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. BEDDING AND BACKFILL <br /> a. All Trusco SUPERTANKS shall be installed using an approved inert bedding <br /> and backfill material as specified below. <br /> Sand: Clean and free of debris <br /> Gravel: 3/4" or smaller rounded aggregate or pea gravel <br /> b. The excavation base shall be covered with a minimum of 12" approved <br /> bedding materials. <br /> C. WARNING: Placement of a tank directly on a holddown pad, on a pad <br /> smaller than the total tank area, or on intermediate supports (saddles) will <br /> cause uneven distribution of loads. This may contribute to structural failure <br /> and is never permitted. <br /> d. - The backfill shall be uniformly the same as the bedding materials and shall <br /> be placed along the bottom and sides of the tank in such a manner as to <br /> ensure the tank is fully and evenly supported. <br /> e. WARNING: Do not strike the FRP secondary containment with shovels, <br /> tamping tools, or equipment! <br /> 4. CONTRACTOR REVIEW OF TANK DELIVERY DOCUMENTATION <br /> a. The Trusco Tank delivery driver shall submit the following documentation <br /> to the contractor upon arrival at the tank installation job site: <br /> (1 ) Installation Instructions <br /> (2) Installation Checklist (one per tank) <br /> (3) Calibration Gage Chart (one per tank size) <br /> (4) Specification Sheet (one per tank) <br /> (5) Pressure Test Instructions (when applicable) <br /> b. The contractor shall compare the specification sheet with the actual tank <br /> to verify tank capacity, UL number, and nozzle and appurtenances <br /> configuration. <br /> C. The contractor shall record the actual vacuum level. See Question No. 1 <br /> on the Installation Checklist. <br /> Installation Instructions -3- Rev. 8/19/94 <br /> Trusco Tank Inc. . P.O. Box 11925 . Fresno, California 93775 . 209-264-4741 . Fax 209-237-3413 <br />
The URL can be used to link to this page
Your browser does not support the video tag.