Laserfiche WebLink
d. The contractor shall submit the Calibration Gage Chart to the tank <br /> owner. <br /> e. The contractor shall complete the Installation Checklist and mail back to <br /> Trusco Tank. Trusco Tank will mail the Warranty directly to the tank <br /> owner. <br /> 5. HANDLING <br /> a. Whenever picking up or moving a 500 thru 1 ,500 gallon Supertank use <br /> the removable lifting lug. On Supertanks larger than 1 ,500 thru 27,000 <br /> gallon use the removable lifting plates as shown in Figure 5. <br /> b. . WARNING: Lifting lugs or plates are shipped with the Supertanks. <br /> Contractor must check prior to lifting tank and, also, confirm that the <br /> lifting plates are parallel to the longitudinal centerline of the tank. <br /> C. Hoisting equipment and rigging shall be of adequate size to handle the <br /> tank weight. The tank weight is marked on one end of the tank. <br /> d. The use of a guide rope to position the tank is required. Never connect a <br /> guide rope to the vacuum gage manifold. <br /> e. Do not drop, roll, or drag the tank! Do not use cables or chains around <br /> the tank! <br /> f. Before any attempt is made to move a tank, it should be established that <br /> hoisting equipment has sufficient capacity and reach to lift and lower the <br /> tank without dragging or dropping. <br /> tyP� Li/t Lug �,�e 5! ° <br /> Not Reusob/e �\ <br /> scra"�L�9 o� <br /> lift Alter /nitio/ G° � <br /> �e <br /> /nsto/%tion <br /> pP�iono/� <br /> c <br /> 110 Io I 'J L pco�io� <br /> 00G <br /> � 5 �50o rh�U 2�00o coiro <br /> Thry NOTE! <br /> 5Q0 Length of Cable to <br /> be Determined so <br /> as to Provide on <br /> Acceptable Included <br /> Angle <br /> Installation Instructions -4- Rev. 8/19/94 <br /> Trusco Tank Inc. . P.O. Box 11925 . Fresno, California 93775 . 209-264-4741 . Fax 209-237-3413 <br />