My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Teflon tape and install the vacuum gage manifold into the coupling. <br /> (3) Reapply vacuum. <br /> f. Items provided by Trusco: <br /> (1) 1 - Vacuum gage manifold (on tank) <br /> (2) 1 - 2" fiberglass pipe x 5' long (tapered each end) <br /> (3) 1 - Bell x female adapter coupling <br /> (4) 1 - Adhesive kit <br /> (5) 1 - Strip of sandpaper <br /> VACUUM GAGE MANIFOLD <br /> (ONLY IF NECESSARY TO REAPPLY VACUUM) <br /> BELL x FEMALE TREAD <br /> ADAPTER COUPLING <br /> (ONLY IF NECESSARY TO REAPPLY VACUUM) 8 <br /> 2' FIBERGLASS BELL COUPOG <br /> PIPE x 5' LONG (INSTALLED 4Y TANK) <br /> (TAPERED EACH END) <br /> 1,(ON7011 WELL <br /> TANK <br /> Figure 14 <br /> 15. FINAL NOTES <br /> a. If any damage occurs to the SUPERTANK during installation, contact a4 <br /> Trusco representative immediately. <br /> b. The primary tank must be regularly inspected for contaminants. <br /> C. Contact a Trusco representative for information on compatible monitoring <br /> systems. <br /> d. The sump area must be kept free of fuels and water. <br /> Installation Instructions -9- Rev. 8/19/94 <br /> Trusco Tank Inc. . P.O. Box 11925 . Fresno, California 93775 • 209-264-4741 • Fax 209-237-3413 <br />
The URL can be used to link to this page
Your browser does not support the video tag.