Laserfiche WebLink
VERIFIED BY: <br /> 1 . Actual vacuum level upon delivery: " <br /> If vacuum level is less than 7", <br /> see "Vacuum Trouble Shooting Instructions." <br /> 2. Was handling performed in accordance with <br /> IS, Section 5? Yes No <br /> 3. Was the tank off-loaded into the excavation, Yes No <br /> or was the tank stored per IS, Section 6? Yes No <br /> 4. Was an air test performed on the primary tank? Yes No <br /> 5. Was excavation size and preparation performed <br /> in accordance with IS, Sections 1 and 2? Yes No <br /> 6. Was bedding installed per IS, Section 3? Yes No <br /> What type of bedding was used? Sand_ Gravel_ <br /> 7. If holddown straps were used, was expansion joint <br /> material used between tank and holddown straps? Yes No <br /> 8. Was backfilling done in accordance with <br /> IS, Section 3? Yes No <br /> 9. Is job site in a known high groundwater area? Yes No <br /> 10. Tank capacity, UL number, and nozzle configuration <br /> have been verified. See IS, Section 4. Yes No <br /> COMMENTS: <br /> AFTER ALL OF THE ABOVE INFORMATION IS COMPLETED, PLEASE RETURN THIS <br /> INSTALLATION CHECKLIST TO TRUSCO TANK INC. THANK YOU. <br /> Installation Checklist page 2 of 2 Rev. 8/19/94 <br /> Trusco Tank Inc. . P.O. Box 11925 • Fresno, California 93775 . 209-264-4741 . Fax 209-237-341-3 <br />