My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROULUURL HR Alk PRESSURE TESTING <br /> J#PERTANKTM ANNULAR SP., E <br /> In the event local regulating jurisdictions insist on a positive pressure test for the SUPERTANKTm annula <br /> space against Trusco's recommendation, the following procedure must be adhered to or the warrant <br /> is invalid. Trusco must be notified of the time and place of the test at least 24 hours in advance of the <br /> test and a copy of this form must be completed, signed by all parties, and returned to Truscc <br /> immediately upon completion of the test. <br /> PRECONDITIONS <br /> 1.Trusco representative must be notified when a SUPERTANKTm annulus is required to be pressure tested. <br /> 2.Install the 2" fiberglass monitor pipe and bell x female adapter coupling per Section 10E of the installation instructions <br /> 3.SUPER TANK TM must be backfilled over the top of the tank as shown in Figure PT-1A (attached). <br /> 4.The valved inlet manifold and valved transfer manifold must each have dual 0-5 psig pressure gages. See Figure PT-2/ <br /> 5.Maximum air pressure applied to steel primary tank shall be 5.0 psig. <br /> 6.Maximum air pressure applied to annular space shall be 5.0 psig. <br /> PROCEDURE <br /> 1.Apply sealant and install plugs, valved outlet manifold, valved inlet manifold with dual 0-5 psig gages and valved transfE <br /> manifold with dual 0-5 psig gages as shown in Figure PT-1A. Make sure all manifold valves are closed. <br /> 2.Start compressor. <br /> 3.While monitoring the two inlet manifold pressure gages, open the inlet manifold valve and pressurize the primary tan <br /> until the inlet manifold pressure gages read the maximum of 5.0 psig. Close the inlet manifold valve. <br /> NOTE : If, while applying air into the primary tank, both gages do not read within 0.5 psig of each other, stop th <br /> test by closing the inlet manifold valve, depressurize the primary tank by opening the outlet manifold valve, replace bot <br /> rages and start over at step 2 <br /> 4.Next, with the inlet manifold valve still closed and while monitoring the two transfer manifold gages, open the transfE <br /> manifold valve to pressurize the annular space to a maximum of 5.0 psig. Close the transfer manifold valve. <br /> NOTE : If, while applying air into the annular space, both gages do not read within 0.5 psig of each other, stop th <br /> test by closing the transfer manifold valve, depressurize the annular space by carefully removing one gage, replace bot <br /> gages, and start over at step 2- <br /> 5. <br /> 5.Hold pressure for the desired length of time. <br /> 6.Depressurize the system by first opening the transfer manifold valve. Next open the outlet manifold valve to purge bot <br /> the primary tank and the annular space at the same rate. <br /> CERTIFICATION <br /> The undersigned do hereby certify that the annulus pressure test was performed in strict conformance <br /> with this procedure for the SUPERTANKT"' listed below. <br /> Performed By: <br /> Company Name Company epnsentaGv Signature <br /> Oats of Test Company Representative Name (Please Print) <br /> Witnessed By: <br /> ReguLatodln3pactor ignatureegu&tor nspector Name (Please Pr Int <br /> Title Regulating Authority <br /> Trusco Order No. Delivery Date <br /> Customer P.O. # U.L Label # <br /> Tank Owner <br /> Installation Address Installation Date <br /> revised a/ala/a <br />
The URL can be used to link to this page
Your browser does not support the video tag.