My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> SMITH <br /> IMPORTANT - READ THIS FIRST .......................................................................................... 2 <br /> INSTALLATION TRAINING SEMINARS ......................................................................... 2 <br /> INTRODUCTION / SAFETY/ CAUTION ........................................................................ 3 <br /> PART ONE: INSTALLATION INSTRUCTIONS FOR PRIMARY PRODUCT PIPING - RED THREAD 11 PIPE, RED <br /> THREAD IIA PIPE,AND RED THREAD II FITTINGS <br /> Section 1 - Storage and Handling <br /> 1.1.1 Packaging, ordering, and shipping information .................................................... 4 <br /> 1.1.2 Packaging............................................................................................ 4 <br /> 1.1.3 Storing ............................................................................................... 4 <br /> 1.1.4 Transporting ......................................................................................... 4 <br /> 1.1.5 Loading and unloading ............................................................................. 4 <br /> Section 2 - Layout and Preparation <br /> 1.2.1 Inspection ........................................................................................... 5 <br /> 1.2.2 Installation crew size and organization............................................................. 5 <br /> Section 3 - Tool and Equipment List <br /> 1.3.1 Recommended equipment for cool weather pipe assembly...................................... 6 <br /> 1.3.2 Recommended equipment for installing 2"-4" pipe............................................... 6 <br /> Section 4 - Joining Methods <br /> 1.4.1 General concepts ................................................................................... 7 <br /> 1.4.2 Bell and spigot joining method ..................................................................... 7 <br /> Section 5 - Cutting and Tapering <br /> 1.5.1 Cutting............................................................................................... 8 <br /> 1.5.2 Tapering ............................................................................................. 8 <br /> Section 6 - Installation <br /> 1.6.1 Piping layout ........................................................................................ 9 <br /> 1.6.2 Trenching and backfilling........................................................................... 9 <br /> 1.6.3 Adhesive bonding..................................................................................10 <br /> 1.6.4 Joint assembly ......................................................................................12 <br /> 1.6.5 Adhesive cure time.................................................................................14 <br /> 1.6.6 Connecting to other systems ......................................................................16 <br /> 1.6.7 Flexible hose connections .........................................................................17 <br /> 1.6.8 Inspecting for potential causes of joint failure ....................................................17 <br /> Section 7 - Testing Recommendations <br /> 1.7.1 Safety precautions..................................................................................19 <br /> 1.7.2 Test procedures ....................................................................................19 <br /> 1.7.3 Air test procedures and safety precautions .......................................................19 <br /> Section 8 - Repair Procedures <br /> 1.8.1 Repairing weather damage ........................................................................21 <br /> 1.8.2 Pipe patching.......................................................................................21 <br /> 1.83 Repairing extensive damage.......................................................................21 <br /> 1.84 Leaking joints.......................................................................................22 <br /> PARTTWO: INSTALLATION INSTRUCTIONS FOR SECONDARY CONTAINMENT PIPING-RED THREAD II PIPE, <br /> RED THREAD IIA PIPE,AND RED THREAD II SECONDARY CONTAINMENT FITTINGS <br /> 23 <br /> INTRODUCTION ................................................................................................ <br /> Section 1 - Secondary Containment Piping System Components <br /> 2.1.1 Secondary containment pipe......................................................................23 <br /> a, Arta r <br /> _�F <br /> Now <br />
The URL can be used to link to this page
Your browser does not support the video tag.