My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.2 Secondary containment fittings....................................................................23 <br /> 2.1.3 Adhesive for secondary containment piping......................................................23 <br /> Section 2 - System Preparation <br /> 2.2.1 Piping layout .......................................................................................24 <br /> 2.2.2 Pipe preparation and tool set-up and use.........................................................24 <br /> 2.2.3 Pipe assembly ......................................................................................2 5 <br /> 2.2.4 Fitting assembly ....................................................................................25 <br /> Section 3 - Containment Crossover Detail <br /> 2.3.1 Preparation .........................................................................................26 <br /> Section 4 - Termination Connections <br /> 2.4.1 Termination at the storage tank....................................................................27 <br /> 2.4.2 Termination at the dispenser ......................................................................27 <br /> 2.4.3 Termination fittings.................................................................................28 <br /> Section 5 - Secondary Containment System Size Reductions ...............................................29 <br /> Section 6 - Secondary Containment Saddles .................................................................29 <br /> Section 7 - Adhesive Bonding and Curing <br /> 2.7.1 Introduction ........................................................................................31 <br /> 2.7.2 Bonding.............................................................................................31 <br /> 2.7.3 Assembling and bolting............................................................................31 <br /> 2.7.4 Precautions.........................................................................................32 <br /> 2.7.5 Adhesive cure ......................................................................................32 <br /> Section 8 - Testing Recommendations for Secondary Containment Piping ................................33 <br /> Section 9 - Repairs <br /> 2.9.1 Replacing leaking secondary containment joints .................................................34 <br /> 2.9.2 Repairing minor pipe damage .....................................................................34 <br /> 2.9.3 Repairing extensive pipe damage .................................................................34 <br /> l <br /> LIST OF TABLES <br /> PART ONE: <br /> Section 1 <br /> Table 1.1.1 Standard Packaging of Pipe .................................................................. 4 <br /> Section 2 <br /> Table 1.2.1 Suggested Units of Labor for Installation .................................................... 5 <br /> Section 3 <br /> Table 1.3.1 Wattage Requirements for Electric Heating Collars ......................................... 6 <br /> Table 1.3.2 Extension Cord Length........................................................................ 6 <br /> Section 6 <br /> Table 1.6.1 Recommended Minimum Burial Depths .................................................... 9 <br /> Table 1.6.2 Adhesive Kit Data............................................................................10 <br /> Table 1.6.3 Adhesive Cure Times When Using Electric Heating Collars...............................15 <br /> Section 8 <br /> Table 1.8.1 Make-up Dimensions (Wet).................................................................22 <br /> PART TWO: <br /> Section 2 <br /> Table 2.2.1 Determining Length of Containment Pipe..................................................25 <br /> Table 2.2.2 Bolt Information..............................................................................25 <br /> Section 3 <br /> Table 2.3.1 Containment Crossover Information........................................................26 <br /> Table 2.3.2 Pipe Separation Distances...................................................................26 <br /> Section 4 <br /> Table 2.4.1 Termination Fitting Connections............................................................28 <br /> Section 7 <br /> Table 2.7.1 No. of Containment Fitting Bonds Per Kit ..................................................31 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.