My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURES FOR THE LOWEST 4. t As serious personal this pressure until all paving <br /> RATED ELEMENT OF THE SYS- injury or death can has been completed. Leave <br /> TEM OR IF YOU CONTEMPLATE result, the pipe inspector pressure gauge on each line \ <br /> USING AIR OR GAS IN SPITE OF should take precautions for for inspection. The contractor <br /> THIS WARNING.REVIEW SAFETY his/her personal safety and should check the gauge daily <br /> PRECAUTIONS, PARAGRAPH protection against flying to verify that the pipe is hold- <br /> 1.7.1, BEFORE STARTING THE debris and also against the ing pressure. <br /> TEST. whipping action of the pipe If a leak is encountered during <br /> If testing with air or gas is which can be the result of the the test procedure, imme- <br /> required or requested to be per- sudden release of stored diately release all pressure in <br /> formed, the following testing energy. Goggles should beworn to protect against flying the piping system and refer to <br /> procedures and precautions Section 8 for proper repair <br /> must be followed. debris. procedures. Upon completion <br /> As in any system where pressure 5. Avoid personal contact of any necessary repairs to the <br /> is employed, adequate safety with the piping system piping system, follow the <br /> precautions must be exercised. while it is pressurized during proper testing sequence and <br /> EXERCISE DUE CARE IN INSTAL- testing, except for the actual verify the system's integrity. <br /> LING AND TESTING THE PIPING checking of the joints for <br /> SYSTEM. DO NOT ASSUME THE leaks. Absolutely no one <br /> RISK OF INJURY OR PROPERTY should be in the trench while <br /> DAMAGE. the pipe is being initially pres- <br /> surized for leak testing. Notify <br /> 1. Visually inspect all bonded all site personnel prior to <br /> joints for proper insertion and beginning the testing pro- <br /> adhesive cure prior to pressur- cedure. <br /> izing the piping system. A gap <br /> between the adhesive bead 6. Q Do not straddle the <br /> and the fitting shoulder indi- pipe during testing or <br /> cates that the possibility of while checking the piping <br /> joint failure exists. Make any system for possible leaks. <br /> necessary repairs before pres- 7. , While the pipe is being <br /> surizing the piping system. checked for leaks, do <br /> See Paragraph 1 .6.9 for not stand at the end of the <br /> potential causes of joint piping system or where it <br /> failure. changes directions.CAUTION: <br /> 2. Check the integrity of the Failure to strictly follow these <br /> joints by pressurizing the sys- instructions can result in <br /> tem to 25 psig(.172 MPa)and serious personal injury, <br /> holding the pressure for a death, and/or property <br /> minimum of one minute,then damage. <br /> soap all joints to test for leaks. 8. Smith Fiberglass Products <br /> 3. If there are no leaks, raise the recommends that after the <br /> line pressure in the system to a piping has passed the 50 psig <br /> maximum of 50 psig (.345 (.345 MPa) pressure test, the <br /> MPa).Again hold the pressure contractor should reduce the <br /> for at least one minute, and product line pressure to a <br /> soap all joints to check for pressure of not more than 25 <br /> leaks. psig (.172 MPa) and maintain <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.