Laserfiche WebLink
PRESSURES FOR THE LOWEST 4. t As serious personal this pressure until all paving <br /> RATED ELEMENT OF THE SYS- injury or death can has been completed. Leave <br /> TEM OR IF YOU CONTEMPLATE result, the pipe inspector pressure gauge on each line \ <br /> USING AIR OR GAS IN SPITE OF should take precautions for for inspection. The contractor <br /> THIS WARNING.REVIEW SAFETY his/her personal safety and should check the gauge daily <br /> PRECAUTIONS, PARAGRAPH protection against flying to verify that the pipe is hold- <br /> 1.7.1, BEFORE STARTING THE debris and also against the ing pressure. <br /> TEST. whipping action of the pipe If a leak is encountered during <br /> If testing with air or gas is which can be the result of the the test procedure, imme- <br /> required or requested to be per- sudden release of stored diately release all pressure in <br /> formed, the following testing energy. Goggles should beworn to protect against flying the piping system and refer to <br /> procedures and precautions Section 8 for proper repair <br /> must be followed. debris. procedures. Upon completion <br /> As in any system where pressure 5. Avoid personal contact of any necessary repairs to the <br /> is employed, adequate safety with the piping system piping system, follow the <br /> precautions must be exercised. while it is pressurized during proper testing sequence and <br /> EXERCISE DUE CARE IN INSTAL- testing, except for the actual verify the system's integrity. <br /> LING AND TESTING THE PIPING checking of the joints for <br /> SYSTEM. DO NOT ASSUME THE leaks. Absolutely no one <br /> RISK OF INJURY OR PROPERTY should be in the trench while <br /> DAMAGE. the pipe is being initially pres- <br /> surized for leak testing. Notify <br /> 1. Visually inspect all bonded all site personnel prior to <br /> joints for proper insertion and beginning the testing pro- <br /> adhesive cure prior to pressur- cedure. <br /> izing the piping system. A gap <br /> between the adhesive bead 6. Q Do not straddle the <br /> and the fitting shoulder indi- pipe during testing or <br /> cates that the possibility of while checking the piping <br /> joint failure exists. Make any system for possible leaks. <br /> necessary repairs before pres- 7. , While the pipe is being <br /> surizing the piping system. checked for leaks, do <br /> See Paragraph 1 .6.9 for not stand at the end of the <br /> potential causes of joint piping system or where it <br /> failure. changes directions.CAUTION: <br /> 2. Check the integrity of the Failure to strictly follow these <br /> joints by pressurizing the sys- instructions can result in <br /> tem to 25 psig(.172 MPa)and serious personal injury, <br /> holding the pressure for a death, and/or property <br /> minimum of one minute,then damage. <br /> soap all joints to test for leaks. 8. Smith Fiberglass Products <br /> 3. If there are no leaks, raise the recommends that after the <br /> line pressure in the system to a piping has passed the 50 psig <br /> maximum of 50 psig (.345 (.345 MPa) pressure test, the <br /> MPa).Again hold the pressure contractor should reduce the <br /> for at least one minute, and product line pressure to a <br /> soap all joints to check for pressure of not more than 25 <br /> leaks. psig (.172 MPa) and maintain <br /> 20 <br />