My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:04:58 AM
Creation date
11/27/2019 10:58:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> PQUIN <br /> SAN JOAQUIN COUNTY <br /> 'i Donna K. Heron, R.E.H.S. Program Coordinators <br /> " X Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> C9��F oRN�P Assistant Director Telephone:(209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Robert McClellon,R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco,R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley,R.E.H.S. <br /> DENIS L BROWN JUL 1 3 2006 <br /> SHELL OIL PRODUCTS <br /> 20945 S WILMINGTON <br /> CARSON CA 90810-1039 <br /> RE: Shell-branded Service Station Site Code: # 1223 <br /> 6131 Pacific Avenue - <br /> Stockton CA 95207 <br /> WORK PLAN: Subsurface Investigation Work Plan APPROVED: [x] <br /> DATED: June 23,2006 DISAPPROVED:[ ] <br /> PREPARED BY: Cambria Environmental Technology,Inc <br /> ADEQUATE AND NECESSARY ELEMENTS OF THEW RK PLAN [H&S 25296.10(c)(3)]: <br /> 1. Installation of one shallow groundwater monitoring well on the south side of the subject site. The well will be built to <br /> intercept and monitor first groundwater. - <br /> 2. Soil samples for lithological interpretation and chemical analysis will be collected during the drilling of the borehole <br /> for the well. <br /> 3. The well will be surveyed to mean sea level by a licensed surveyor following installation. <br /> COMMENTS AND CONDITIONS: <br /> i <br /> 1. Please proceed with submittal of a San Joaquin County Well Permit Application,required$89.00 permit fee and <br /> with scheduling the approved work. <br /> 2. The deadline for having the monitoring well installed is October 27,2006. <br /> 3. A report of findings must be submitted to SJC/EHD within 60 days following completion of the well installation. <br /> 4. Forty-eight hours notification to SJC/EHD is required prior to all site fieldwork. <br /> Lori Duncan,Senior RENS Nuel C.Henderson,Jr.,PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James Barton,CVRWQCB <br /> Aubrey Cool,Cambria <br />
The URL can be used to link to this page
Your browser does not support the video tag.