My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:01:53 AM
Creation date
11/27/2019 10:59:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C A M B R I A Ms. Lori Duncan <br /> November 18,2005 <br /> TABLE A: GROUNDWATER DISPOSAL COST COMPARISON <br /> Off-Haul Treat and Discharge <br /> Additional One-Time Costs <br /> Installation $2,500 $54,850 <br /> Permits $0 $1,500 <br /> Start-up $0 $1,500 <br /> © Total One-Time Costs $2,500 $57,850 <br /> Additional Annual Costs <br /> O&M Labor $1,440 $4,860 <br /> Utilities $0 $1,000 <br /> Consumables $14,304 (tank rental) $1,200 <br /> Analytical $0 $2,880 <br /> Carbon Replacement $0 $3,000 <br /> Discharge Fee $0 $7,392 <br /> Vacuum Truck $101,400 $0 <br /> Total Additional Annual Costs $117,144 $20,332 <br /> Anticipated Duration (years) 4 4 <br /> Extended Additional Annual Costs $468,576 $81,328 <br /> Total Additional Costs $471,076 $139,178 <br /> Based on this cost comparison, discharging treated groundwater to the sanitary sewer is the more <br /> cost-effective option. Therefore, treatment and discharge of extracted groundwater has been <br /> incorporated into the DPE system design as discussed below. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.