Laserfiche WebLink
GEOPROBE CONSTRUCTION DETAIL GRAPHIC DESCRIPTION <br /> PID Blom I..O' <br /> (ppmvl counts <br /> 24 24 <br /> 4SILT sdft brown,damp no odor <br /> 26 26 <br /> 28 28 <br /> 30 30 <br /> u� <br /> LL 0 00 01 <br /> LU 32 32 <br /> 11 01 00 <br /> 0 34 34 <br /> z00 0 <br /> 3 M SILT soft.blws"rey,mast,no odor <br /> 36 36 <br /> o <br /> In 38 38 <br /> CL <br /> U.1 <br /> a 40 40 <br /> 42 42 <br /> 44 44 <br /> 5 <br /> 46 46 SILT with clay soft greyish-brown,damp,no odor <br /> 48 48 <br /> Inch Radius 0 2 4 9 <br /> Explanation Conu<cra <br /> Geo P ro be 1 <br /> Z water level in Meted well — Solid where tartan <br /> Q, First water found during drilling .... Dotted where approximate Shell Service Station WIC#204-7525-0104 Page <br /> 6131 Pacific Avenue 2 Of 3 <br /> ® Locatnn of recovered drill sample — — Dashed where uncenam Stocldon,CA <br /> ■ Lacahon of sample sealed for fi/if Hachured where gradational a Drawn air Well Number <br /> Onmral anaysie <br /> J Parades <br /> est K >rsunwnad pernwabildy UAW October 2s 1945 Geo-1 <br /> ® Swve sample (hydraulic mnductemy) <br /> 1 K-pnmary 2K—secondary rrNi Award By <br /> ® Continuous Core J Parade Job NVmbw <br /> "; No Recovery DA%L November a 1995 93-47-0020 <br />