Laserfiche WebLink
GEOPROBE CONSTRUC71ON DETAIL GRAPHIC DESCRIPTION <br /> NO slow LM <br /> (ppnw) counts <br /> 48 48 <br /> 50 50 <br /> ML <br /> 52 52 Pushed to 52,dry <br /> 00 0 <br /> 00 0 <br /> 54 54 Pushed to 52'.dry <br /> LU — MEN] water finally came in at 55' <br /> !4sampled at 1300 <br /> W 56 56 <br /> LL <br /> cc <br /> to 58 58 <br /> zz <br /> � so so <br /> 62 62 <br /> 64 64 <br /> 66 66 <br /> 68 68 <br /> 70 J Parades 70 <br /> fVovember a 1996 <br /> fit 72 <br /> � , � r � rlrl , l , l <br /> Ind?Radius 0 2 4 8 <br /> Explanation aomams GeoProbe 1 <br /> 1 waxer level,n computed well — Said where corun <br /> a Firm water found during drilling ... Dotted whore approximate Shall Service Station WIC#204-7525-0104 Page <br /> fi131 Pacific Avenue 3 of 3 <br /> ® Location of recovered drill simple — — Dashed where urxcertarrt Stockton, CA <br /> • dxamral � !!! nd where gradational D <br /> gradational ��� Dramx�. J Parade Well Nurrlber" <br /> ■ Localron of sample sealed for <br /> 'sa�K f HachuSminatedpermeabdny Dart Geo-1 <br /> ® Slew*sanple (hydraulic conductxvrty) October 25 19116 <br /> I K-primary 2K-secondary m pm Sm 0"ay <br /> ® <br /> continuous Core J Paradis Job Number <br /> ar November 8 1905 93-47-0020 <br />