Laserfiche WebLink
` VV ELL MONITORING DATA SHEET <br /> Project # b _ Client ge , <br /> . Sampler Start Date <br /> ie s o <br /> Well l D Well Diameter Q 3 4 6 8 <br /> Total Well Depth- Depth to Water _3 1 r,S <br /> Before After- Before After <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to V Grade ID 4. Meter (if req'd). Ysl HACH <br /> Purge Method Sampling Method Bailer <br /> Bailer Waterra Disposable Bailer t/* <br /> D sposable Bailer Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubmg <br /> Electnc Submersible Caber Other <br /> Welt Diameter Multiplier Well Diameter Multiplier <br /> 1" 004 4" 065 <br /> ,S {Gals)X _ /0,C Gals 2" 0 16 6" 147 <br /> 1 Case Volume Specified Volumes Calculated Volume 3" 037 Other rad=2*0 I63 <br /> Time Temp (°F) pH Cond Turbidity Gals Removed <br /> Observations <br /> py_a% 61 , 7 G , 1 -Zti� Zoo 14.,r1a;r� <br /> 7'-i 1 > o <br /> Lc T%.,i <br /> U 79f 1, 6,S <br /> O 7,512OTWb� <br /> 6- <br /> Did well dewater? Yes Gallons actually evacuated �o <br /> Sampling Time 7 S5 Sampling Date <br /> Sample I D Laboratory , <br /> Qnal,r�arl f., �T'1 ��'7� Vis. <br /> u Ay��u 1�1 a p ivi��� TrH-D Other <br /> Equipment Blank I D @ 'rune Duplicate I D <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br /> D O (if req'd) Pre-purge mg/L Post-purge mg/L <br /> I�RP (if req'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />