Laserfiche WebLink
i <br /> V9 ALL MONITORING DATA SHEET <br /> Project #: a 6 _ ' Client <br /> I <br /> Sampler Start Date <br /> Well I D - _ Well Diameter 3 4 6 S <br /> Total Well Depth- Depth to Water: <br /> Before After Before After <br /> f <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to. PV Grade ID O Meter (if reg'd)- Ysl xAcx <br /> Purge Method Sampling Method Bailer <br /> Barer Waterra Disposable Bailer Y", <br /> T�>sposable Bailer Peristaltic Extraction Port <br /> /Middleburg Extraction Pump Dedicated Tubmg <br /> Electric Submersible Other Other <br /> Well Diameter Multi her Well Diameter Multiplier <br /> 1. 004 4" 065 <br /> 3 '1' (Gals)X = 12, Gals 2. 016 6" 147 <br /> 1 Case Volume Specified Volumes Calculated Volume 3" 037 - Other radius'*0 163 <br /> Time Temp {°F) PH Cond, Turbidity _ Gals Removed -Observations <br /> 8 5- -7 . ) 1 Z '>z ID C2 n CJLof r <br /> -7 -7.I t b >Zo-0 $ �+t • l <br /> w Z. <br /> � 0 <br /> Did well dewater? Yes _ 1 _ o Gallons actually evacuated- - - <br /> Sampling Time: - Sampling Date 1- 16-01 <br /> Sample I DY Laboratory <br /> Analyzed for: TPx- MTB TPH-D Other <br /> Equipment Blank I D @ Tie _ Duplicate I D . r <br /> Analyzed for- TPH-G BTEX MTBE TPH-D Other <br /> DO (if req'd) Pre-purge mg/L Post-purge mg/L <br /> ORP (if req'd) Pre-purge mV Post-Purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />