My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012659
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:21:52 PM
Creation date
12/3/2019 3:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012659
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compliance with the Local Air pollution Control District, <br /> by permit, and in agreement with the San Joaquin Local <br /> Health District. <br /> x. soil Sampling <br /> We propose to take three samples per 50 yards of soil- <br /> to one sampld by e per truck load (15 to 17 yards <br /> This equates <br /> per load) composite California Water Labs. The <br /> be one Ba <br /> soil will be stored in 50 cubic yard blocks By using thisby <br /> block (s©e proposed soil storage diagram) . y g <br /> storage method, we hope to make the treatment decisions <br /> easier for the health District, and Air Pollution district. <br /> XI. Time schedule <br /> The proposed "re-excavation" and remedial activities will <br /> be in three phases. <br /> se Phase I will include excavating contaminated soil <br /> from location, and placing the soil in segregated secure <br /> would install one or more ground <br /> piles. Additionally we <br /> water extraction wells priorior tacexcavati , so as not <br /> on,wateranduwe will <br /> some ground water pumping.s" <br /> do periodic, "rush analysis" on the ground storm <br /> to discharge any contaminated water to the sewer °royal of <br /> drain. This work would begin within 5 days of app <br /> oaquin Local Health District. Water <br /> this plan by the San J <br /> " analysis would be available in 24 hours or less, soil <br /> analysis within 15 days from data of sampling. <br /> base X Upon approval of the San Joaquin Local Health <br /> will be back filled with clean <br /> pistrict the excavation <br /> material and compactedto <br /> . awillthenberep <br /> tamet eespecifications <br /> laved and put <br /> Union Ice company. <br /> back into service as a parking area. <br /> Phase III: Upon determination of the appropriate treatment <br /> techniques, and when ambient temperature is conducive to <br /> aeration or bioremediation, permits will be applied for, <br /> and treatment will begin. The soil will be treated to a <br /> degree that is acceptable to the San Joaquin Local Health <br /> District standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.