Laserfiche WebLink
UNION ICE COMPANY <br /> Report of Findings <br /> r <br /> I.0 IATRODUCTION <br /> In March of 1990, Omni Enterprises and Heniu4�and Associates were retained by <br /> Union Ice Company to conduct a subsurface investigation related to leaking <br /> underground fuel tank(s)and the resu:ting soils and ground water contamination <br /> problem at Union Ice Company's facility on West Weber Street iii Stockton, <br /> California. <br /> The Union Ice facility site is a parcel of property approximately 13 acres in size. It is <br /> located hi a portion of the S 112, Section 10, Township 1 North, Range 5 Fast, <br /> M.D.B.&M. The physical location is 1320 West Weber Street, City of Stockton, <br /> Count`j of San Joaquin, California(Figure 1). <br /> This facility manufactures ice and provides cold and frozen storage in two main <br /> warehouse buildings on the site. Site topography is generally flat lying. Most of the <br /> site is covered by asphalt and concrete pavement. The Union site is nearly surrounded <br /> by the Stockton Deep Water Channel to the North and Mormoi, Slough to the South. <br /> Surface elevation is approximately 97 feet A,M.S.C. <br /> Fc ur underground storage tanks were removed at the facility in December 1988. <br /> During removal of the tanks, gasoline, approximately four to sic inches thick, was <br /> found floating on ground water encountered in the bottom of the excavation. The <br /> amount of gasoline which leaked is unknown. <br /> 2.0 SCOPE OF WORD <br /> In March of 1989, UR.S Consultants (URS) were retained by Union Ice Company to <br /> perform a remedial investigation. Their work plan was designed to investigate the <br /> lateral and vertical extent of gasoline contamination of ground water at the site, along <br /> with the implementation of remedial measures. (Refer to "Ground water Investigation <br /> Work Plan for Union Ice Company, March 13, 1989," URS Consultants). <br /> ------ — - <br /> The URS proposal called-for-l0-monitoring wells to be drilled,-in-order.to mvestiga -T_- --- ---_-- - - -_-- -- <br /> both the first and secocsd aquifers. Three of these wells,MW-1D, MW-1S and MW-6S <br /> were completed on August 28, 1989. At that time, the decision was made by Union <br /> `gig'' Ice Company to suspend the investigation and resume at a later date. <br />