Laserfiche WebLink
-2- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-02-625 ith the <br /> 2. The driveway approach shall be improved in accordance <br /> occu ancy permit. of San <br /> Joaquin County Standards R-17 prior to issuance of P <br /> (Development Title Section 9-1145.5) <br /> t to <br /> to <br /> 3. <br /> The owner shall execute an Irrevocable Offer and Agreement of educatelive R a to the result in <br /> a thirty-seven(37) foot wide right-of-way from the center <br /> property line across the parcel's frontage. (A$350.00 fee currently is required <br /> the Grant Deed <br /> processing per Development <br /> fee Table 0red for dedi�tion) (The fee due will be <br /> n to a copy of <br /> and a legal description oft parcel to be <br /> based on the current fee schedule.) <br /> (City of Ripon) <br /> 4. The owner shall execute an Irrevocable Offer and Agreement e Dedicate <br /> Road to the in <br /> a seventy(70) foot wide right-of-way from the centerline o p <br /> property line across the parcel's frontage. (A$350.00 fee currently is required for <br /> of the Grant Deed <br /> processing per Development Title Table 9-240.2 in addition to a copy <br /> and a legal description of the parcel to be offered for dedication.) (The fee due will be <br /> based on the current fee schedule.) <br /> (City of Ripon) <br /> 5. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $164.68 per <br /> additional daily trip-end generated in the Ripon area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. <br /> (Resolutions 00-433) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:ar <br /> P:\C0MNffiNTS\SA\YR 2003\PA-02-625 wpd <br />