My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007896
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1325
>
3500 - Local Oversight Program
>
PR0545007
>
ARCHIVED REPORTS_XR0007896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 2:44:50 PM
Creation date
12/5/2019 1:59:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007896
RECORD_ID
PR0545007
PE
3528
FACILITY_ID
FA0025604
FACILITY_NAME
CATELLUS DEVELOPMENT PROPERTY
STREET_NUMBER
1325
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
1325 W WEBER AVE
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3 <br /> INVESTIGATION ACTIVITIES <br /> Four groundwater monitoring wells were constructed by ERM-West, <br />�\ Inc on March 27 and 28, 1992. The wells labeled MW-1A through <br /> MW-4A were installed in locations to obtain the maximum amount of <br /> information to characterize the soils and groundwater at the site <br /> (Figure 1-2) One well (MW-2A) was located at the approximate <br /> center of the former tank location Wells MW-1A and MW-3A were <br /> installed to the north and east of the former tank location, <br /> respectively MW-4A was installed inside the warehouse building to <br /> the south of the former tank location The wells surrounding the <br /> former UST location were placed in a triangular pattern so that a <br /> 3-point determination of groundwater gradient could be made <br /> Preparation <br /> Preliminary work included: preparing an Investigation Work Plan; <br /> preparing a site-specific Health and Safety Plan; and retaining a <br /> contractor responsible for drilling and laboratory activities <br /> Preparatory work also included obtaining the necessary permits, <br /> locating underground utilities, and relocating the soil stockpile that <br /> was situated above the former UST. <br /> The Investigation Work Plan specified the steps that would be <br /> followed to install the monitoring wells (Appendix C) A copy of the <br /> request letter from San Joaquin County Environmental Health <br /> Division is included the Work Plan (Appendix C). The contractor <br /> responsible for the drilling activities was Spectrum Exploration, Inc., <br /> located in Stockton, California Jim Dobbas, Inc was utilized to <br /> move the soil pile that overlies the site of the UST excavation. <br /> ERM-West was responsible for overall site management and <br /> submittal of documentation. The laboratories used by ERM-West <br /> were Sequoia Analytical of Concord and Superior Analytical of <br /> Martinez Both laboratories are certified in the State of California <br /> L <br /> 3-1 <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.